Laserfiche WebLink
• Section 5— Pollution Prevention Team: This section identifies the appropriate contact <br />names (emergency and non-emergency), monitoring personnel, and the onsite <br />temporary erosion and sedimentation control inspector. <br />• Section 6— Inspection and Monitoring: This section provides a description of the <br />inspection and monitoring requirements such as the parameters of concern to be <br />monitored, sample locations, sample frequencies, and sampling methods for all storm <br />water discharge locations from the subject site. <br />• Section 7— Recordkeepin�: This section describes the requirements for documentation <br />of the BMP implementation, site inspections, monitoring results, and changes to the <br />implementation of certain BMPs due to site factors experienced during construction. <br />Supporting documentation and standard forms are provided in the following Appendices: <br />Appendix A — Site Plans <br />Appendix B — Construction BMPs <br />Appendix C—Alternative Construction BMP List (Not Used) <br />Appendix D— General Permit (Not Used) <br />Appendix E— Site Log and Inspection Forms <br />Appendix F — Engineering Calculations <br />TESC Plan and SWPPP 2 June 2015 <br />American Legion Memorial Park Page 4 <br />