My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5214 S 2ND AVE 2016-11-16
>
Address Records
>
S 2ND AVE
>
5214
>
5214 S 2ND AVE 2016-11-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 5:34:54 AM
Creation date
11/8/2016 8:45:26 AM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5214
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AD/l�l/N/ST/�AT/ON <br />March 12, 2007 <br />Tom and Alana Campbell <br />6308 E. Lake Sammamish Parkway NE <br />Redmond, Wa 98052 <br />Re: Letter Dated 2/25/07 <br />Dear Mr. �nd Mrs. Campbell: <br />Everett <br />� <br />�i <br />�°��' � � <br />s <br />ZUU2 <br />The Mayor's Office received your letter concerning your misfortunes related to <br />your efforts to rebuild your home damaged by the fire. The City's Building Officfal <br />has reviewed this matter. His Department's review indicates the following: <br />- A permit to repair the fire damage (roof) was applied for on June 27, 2006 by <br />your contractor. The plans were prepared for Sound Loss and Claims (David <br />Griffiths) on your behalf. <br />- The permit was processed and available to be picked up on July 5, 2006. <br />However, the permit was not picked up by your contractor until October 25, 2006. <br />- TI`�re have been no revisions to the plans originally submitted and approved. <br />- There have been no inspections called for by you or your contractor to date for <br />this permit. <br />- No one has asked the City stop work, rescind the permit or revise the approved <br />plans. <br />- The Building Department met with Mr. Jack Feingold (approx. July 06) who <br />was retained by Farmers Insurance Company to look into the scope of work. He <br />asked if the City would require the entire roof be removed. The Building Official <br />answered that the City would require repair of the damaged portions of the <br />structure and that the non-damaged portions could remain. A determination of <br />what was damaged versus undamaged would need to be made and verified by <br />the contractor's/owner's engineer. The City has not been contacted by Mr. <br />Feingold since that meeting. <br />CITY OF EVERETT• 2930 Wetmore Ave., Suite 10-A • Everett, WA 98201 •(425) 257-8700 • Fax (425) 257-8729 %5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.