Laserfiche WebLink
15. Prior to issuance of any permits, landscaping plans must be reviewed and <br /> approved by the Planning Department per Section 35.100 of the Zoning Code. <br /> 16. A traffic study is required; the transportation section of the checklist <br /> needs to be completed. <br /> 17, Traff3c impact mitigation according to the "Interim Traffir_ Mitigation <br /> Ordinance" will be required. <br /> ig, Eaterior building materials shall be selected so as not to project or <br /> reflect natural or art3ficial lighting or glare into residential areas. <br /> 19. Mechanical equipment located on the roof, facade, or esternal portion of <br /> the building shall be architecturally screeaed by including the equipment <br /> in the huilding or site design so as not to be visible from adjacent <br /> properties or public streets. <br /> Zp. Equipment or vents which generate noisef=�r aad oining�residentially�zoned <br /> on the opposite side of he building j <br /> properties. <br /> Z1� furtherliwill attempt m toy addressl anyy easonable nnoise r co plaiats 8by <br /> modifying the transportation facility operation. <br /> 22. Truck loading operations and maneuvering areas shall not be located within <br /> required building setback a.reas or within one-hundred (100) feet of areas <br /> zoned for resldential use. Tru�gr�ingi°andnlmaneuver ngl arease shallttbe <br /> on streets. Truck loading, p <br /> screened from abutting properties and streets by a sight obscuring fence <br /> eight �8) feet in helght �r iinstandardgithin a ten C10) foot wide <br /> landscaped area planted to Type <br /> 23. Fire flow requirement is dependent upon the type of construction used in <br /> the building as follows: <br /> . . 1,750 GPM <br /> lype III 1-Hour, Sprinklered. . • • • : : ; : . , 1,750 GPM <br /> Type II 1-Hour, Sptinklered . . . . • <br /> , , . 2,700 GPM <br /> 'l�pe II-N, Sprinklered . . . • • • • : : : . . , Z�700 GPM <br /> Type III-N, Sprink2ered . . . . . . • <br /> Thera fire flows may be adjusted upward if high-piled combustible storage <br /> operations are instituted in the warehouse portion of the project. <br /> 24. The three hydrant locations shown on the site plan reviewed are acceptable. <br /> p5. Access - OK as shown on the aite plan reviewed. <br /> -16- <br />