|
Washington State Department of Transportation Page 2 Six-year Transportation Improvement Program
<br /> Agency Everett From 2008 to 2013
<br /> County No. 31 Hearing Date:
<br /> City No. 420 Adoption Date:
<br /> MPO PSRC
<br /> Resolution No.
<br /> Project Identification Project Costs in Thousands of Dollars Federally Funded
<br /> A.Federal Aid No. Fund Source Information Expenditure
<br /> B.Bridge No. Federal Funding ency Projects Only
<br /> C.Project Title
<br /> R/W
<br /> D.Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required
<br /> Functional Priority E.Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thin Envir. Date
<br /> Class Number F.Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2008) (2009) (2010) 6th Type (MMM')
<br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 _ 15 16 17 18 19 20 21
<br /> 11 11 3 phases in project 3 P 0.3 C PE 1/1/2009 WSDOT 2,000 2,000 1000 1000
<br /> Interstate P RW 1/1/2010 WSDOT 1,000 1,000 1000
<br /> 1-5/128th Street HOV Ramps T CN 5/1/2012 WSDOT 12.000 12,000 3000
<br /> 1.5 at 128th Street and Mariner PNR 0
<br /> I-5 at 128th Street and Mariner PNR
<br /> Add HOV ramps to and from Mariner PNR(0 128th St. Totals 15,000 0 15,000 0 1,000 Z000 3,000
<br /> 11 12 3 phases in project 3 P 0.2 0 PE 1/1/2013 WSDOT 3.000 3.000 3000
<br /> Interstate Various
<br /> 1-5/112th Street Interchange Study
<br /> Interstate 5 at 112th Street SE
<br /> Interstate 5 at 112th Street SE
<br /> Study possible interchange improvements Totals 3,000 0 3,000 0 0 0 3,000
<br /> 14 1 3 phases in project 3 P 2.5 C PE 6/1/2012 RTID 15,000 15,000 7,000
<br /> Freeways 5/640 P RW 6/1/2014 RTID 50.000 50,000
<br /> US 2 Improvements T CN 6/12016 RTID 347,000 313,000
<br /> US 2 Improvements O
<br /> 1-5 and SR 204
<br /> Add lane each direction,improve interchanges Totals 41Z000 378,000 0 0 0 7,000
<br /> 12 2 3 phases in project 3 P 0.3 C PE 1/1/2013 WSDOT 4,000 4,000 2,000
<br /> Freeways P RW 6/1/2015 WSDOT 11,000 11,000
<br /> SR 526/Hardeson Road Interchange T CN 6/12017 WSDOT 23,000 23,000
<br /> SR 526 0
<br /> SR 526 at Hardeson Road
<br /> Add on and off-ramps Totals 38,000 0 38,000 0 0 0 2,000
<br /> 12 3 3 phases in project 1 P 0.3 0 PE 6/12010 WSDOT 8,500 8,500 8,500
<br /> Freeways 0
<br /> SR 526 Extension Study 0
<br /> SR 526
<br /> Interstate 5 to US 2 across the Snohomish Valley
<br /> Study possible extension of SR 526 across Sro.Valley Totals 8,500 0 8,500 0 0 0 8,500
<br /> 12 3 3 phases in project 1 P 0.3 C PE 6/1/2013 WSDOT 4,000 4,000 2,000
<br /> Freeways P RW 6/12015 WSDOT 11,000 11,000
<br /> SR 526/Evergreen Way Interchange T CN 6/1/2017 WSDOT 23,000 23,000
<br /> SR 528 0
<br /> SR 526 at Evergreen Way
<br /> Interchange improvements Totals 38,000 0_ 38,000 0 0 0 2,000
<br /> 14 1 HP-1998(021) 4 phases in project 4 S 1.5 C PE 3/1/2003-DEMO 500 468 968
<br /> Principal P PE FAST 600 600
<br /> Arterial East Marine View Drive Improvements T RW 7/1/2005 DEMO 592 592 MCE 2/1/2007
<br /> East Marine View Drive 0 CN 8/1/2007 DEMO 3,808 FMSIB 600 859 5,267 7,300 1.500
<br /> North Broadway to Interstate 5 DEMO 3,500 3,500
<br /> Design,construct roadway widening and improvements Totals 9,000 600 1,327 10,927 7,300 1,500 0 0
<br /> 14 2 2 phases in project 3 S 0.2 C PE 10/1/2004 AIP 45 22 67
<br /> Principal P CN 812007 AIP 455 228 683 683
<br /> Arterial Broadway/Beverly Blvd.Intersection Improv. T
<br /> So.Broadway,Beverly Boulevard 0
<br /> Broadway at Beverly to SR 526
<br /> Design and construct Intersection improvements Totals 500 250 750 683 0 0 0
<br /> 14 3 2 phases in project 4 P 0.3 C FE 1/1/2010 75 75 75
<br /> Principal P CN 7/1/2011 AIP 225 200 425 425
<br /> Arterial Evergreen Way Widening T
<br /> Evergreen Way O
<br /> 11500 block to Airport Road
<br /> Design,construct street widening/improvements Totals 225 275 500 0 0 75 425
<br /> 14 4 3 phases in Project 31 P 0 C PE 2/1/2013 TPP 4,810 4,810 3.000
<br /> Principal P RW 2/12015 TPP 1,350 1,350
<br /> Arterial Broadway Corridor Improvements T CN 6/12017 TPP 27,850 27,850
<br /> South Broadway Corridor O
<br /> SR 526 to 37st Street;including bridge south of 41st Street
<br /> Widen to 5 lanes with bike lanes 8 sidewalks;new bridge Totals 34,010 0 34,010 0 0 0 3,000
<br />
|