Laserfiche WebLink
soils around Building 4 during the course of construction and removed following <br />construction. Where the contractor feels it is best to remove shrubbery to perform <br />the work, the shrubbery will be documented by the contractor and replaced to <br />match existing at the conclusion of the project. <br />d) BMP C 101: All natural vegetation will be retained to the fullest extent possible. <br />BMP C 102: No buffer zones are proposed. <br />BMP C 103 : A chain link security fence currently exists around the area of <br />Building 4 which will remain throughout construction. A high <br />visibility plastic fence is not proposed for this project. <br />Element #2: Establish Construction Entrance <br />a) This project has no earthwork, clearing or grading. Truck access for the <br />construction project is limited to material deliveries and worker access. The <br />current site paving and parking layout is one -directional and is shown on the Site <br />Plan drawing. All trucks will be driving on asphalt -paved driveways on -site and <br />no sediment will be carried from the site to city streets and roads. <br />b) No street washing of city streets is proposed. <br />c) Washing of sediment from driveways on -site will be performed on an as needed <br />basis and upon completion of the project. <br />d) BMP C 105: No stabilized construction entrance is proposed. <br />BMP C 106: No wheel wash is proposed. <br />BMP C 107: No construction road/parking area for construction purposes is <br />proposed. <br />Element #3: Control Flow Rates: <br />a) The proposed repair for Building 4 at the Beverly Village Apartments involves <br />rebuilding the building's roof back to its original configuration and size. No <br />change in impervious surface from roofs is proposed. The only site change <br />proposed is a 6' wide by 10' long concrete patio at Unit 411 near the north end of <br />the building, which is partially under the roof overhang. <br />b) No changes to off -site flows are proposed. No downstream analysis was <br />performed. <br />c) Since no clearing or grading is proposed, no construction site stormwater <br />retention/detention facilities for this project are proposed. <br />14037B C-SWPPP Narrative 31 <br />