d) No permanent infiltration ponds are proposed for flow control during the <br />construction of this project. <br />e) BMP C240: No sediment trap is proposed for the downslope end of Building 4 <br />BMP C241: No temporary sediment pond is proposed. <br />Element #4: Install Sediment Controls <br />a) The silt fence is proposed to be installed at the east and west sides and downslope <br />north side of Building 4 prior to construction starting and will remain in place <br />until the end of the construction project to ensure all sediments in the construction <br />zone around Building 4 are appropriately contained within the construction zone <br />until construction ends. <br />b) The silt fence will be constructed prior to any site work around Building 4, and <br />construction work on Building 4, being performed. <br />c) The construction project is not located in any salmon waterways, wetlands or <br />streams. <br />d) BMP C230: No straw bale barriers are proposed. <br />BMP C231: No brush barrier is proposed. <br />BMP C233: A silt fence is proposed fin the location of the silt fence shown on <br />the Site Plan drawing. <br />BMP C234: No vegetated strip is proposed. <br />BMP C235: No straw wattles are proposed. <br />BMP C240: No sediment trap s proposed. <br />BMP C241: No temporary sediment pond is proposed. <br />BMP C250: No construction stormwater chemical treatment is proposed. <br />BMP C251: No construction stormwater filtration is proposed. <br />Element #5: Stabilize Soils <br />a) All existing landscaping in the construction zone will be retained as best as <br />possible throughout the course of the construction project. A duff layer will be <br />laid down before construction starts in open landscape areas within the <br />construction zone. The duff layer will be cleared off at the end of the construction <br />proj ect. <br />b) No clearing and grading activities are proposed for this project. <br />c) All temporary erosion control measures will be remain functional at the site until <br />the construction work on the building is completed. <br />14037B C-SWPPP Narrative <br />8 <br />