Laserfiche WebLink
a <br />5.) Drain details are provided on sheet A6.04. <br />6.) 60mi1. TPO class B roofing shall be used —This note has been added to the roof plan — <br />see sheet A2.06 and noted on A26.04. <br />Structural <br />1.) See structural revisions. <br />2.) See structural revisions. <br />Mechanical <br />1.) This requirement is noted in the general plan notes. A keynote (#6) has been added to <br />sheet A2.00 for clarification. <br />Accessibility <br />� 1.) The exterior treads out of the stairway have been removed allowing access to the <br />courtyard, an emergency two way communication device has been provided at the stair <br />landing. <br />2.) The south stair exit door [030a] shall be labeled as an "Exit Only", and access shall be <br />prevented from the exterior, therefore an additional exterior entry door shall not be <br />required — see attached revised door schedule. <br />3.) 7 accessible units have been provided see plan sheets A2.00 — A2.05 for correctly <br />labeled units. <br />4.) Sheet A2.07 has been revised to show the correct unit types. <br />5.) A7.01 has been clarified to show compliance. <br />6.) Sheet A2.07 and sheet A7.01 have been cross referenced to show compliance, <br />accessible plans have been revised. <br />If you have any questions or need additional information please feel to contact us. <br />Sincerely, <br />Joshua Scott <br />Koz Development <br />1208 Tenth Street, Suite 201, Snohomish, WA 98290 <br />(� / <br />