|
August 13, 2013
<br />Meg Haley
<br />C ity of Everett
<br />Public Works
<br />3200 Cedar Street
<br />PO Box 34019
<br />Everett, WA 98201
<br />Plan Review: B1307-015
<br />Project: Eastlake Community Church
<br />Address: 9506 7`h Ave SE Everett, WA 98208
<br />Dear Ms. Haley,
<br />�� IQ � �lrchitects
<br />�
<br />�z_� �-� � �i � __..-�....,,,,...�
<br />" , �'
<br />�f s,�,�lj;J'�f���,! � �yw;',;
<br />�� i ,� .._� i.� :_:� 3 d � ��
<br />,
<br />„�o �'� �� q
<br />i�� p.�� �;Uu � 4 ?��3 f �/�
<br />�
<br />� �,. �_ � , ,- � � �_
<br />c'�•�y � E.. 9 a� �.'��M�>,t�,�� �_
<br />;� d
<br />��--_�-..._���'�`��'��`���"�� .
<br />Here are our responses to your permit review comments of July 26, 2013. Your
<br />comments are in italics and our responses follow in bold.
<br />General:
<br />1. Since the building is /arger than 4000 square feet, and the re�isions affect life
<br />safety and structura/ systems, architectural revisions are required for this tenant
<br />improvement permit, and those drawings shou/d be stamped by a licensed
<br />architect, per RCW 18. 08, 410 (7).
<br />SABA Response: See attached Architectural drawings A0.1 —A9.1.
<br />Z To indicate what is being proposed as new work on this permit, please re�ise the
<br />drawings as fol%ws.•
<br />a. P/ease indicate new work with dark /ines. Existing work shou/d be
<br />indicated as light lines, and demolition work shou/d be indicated with
<br />dashed lines. This inc/udes ceilings, wall sections, doors, stairs, ramps,
<br />structure, and toilet rooms, and any other re�ision where a building
<br />permit is required, per IBC section 105.1,
<br />b. New walls shou/d be targeted on the p/ans to detailed wa/l sections.
<br />SABA Response: See attached Demo drawings A2.1 & A2.2 and
<br />Architectural Construction drawings A2.3, A2.4.
<br />3, The area of new work shou/d be identified with a scoping bubble on the overa/l
<br />floor p/an.
<br />a. Work not inc/uded should be omitted from drawings, if it not part of the
<br />current scope of new work. Historical drawings that indicate "as-is"
<br />construction, prior to the tenant improvement, should not be included in
<br />the permit set,
<br />b. Work inc/uded on this permit shou/d ha ve room numbers, room names,
<br />door numbers, and wall targets on the drawings for easier reference.
<br />,, , _ , t
<br />, , �.. _ .. _.i . .� ... . ;�. ��.,.. _ (�, . :F; .. . .— ..ro.� _ �a',.�i �
<br />���
<br />
|