Laserfiche WebLink
Eg ress <br />1. The re�ised drawings shou/d c%ar/y indicate the path of travel to the exits, per <br />IBCsection 1020.1, <br />a. The exit and exit access discharge shou/d be shown on the drawings <br />discharge to the public way, per IBC sections and tables 1015.1, 1021.2. <br />1027.1, and 1027. 6, The sidewalks immediate/y outside of the exits shou/d <br />be shown on the drawings. <br />SABA Response: See attached Architectural drawings A1.2, A2.3, A2.4. <br />b. Fixtures and furnishings shou/d be shown on the drawings to demonstrate <br />the minimum egress aisle width of 36 inches, per IBC section 1017.2, un/ess <br />the occupant /oad requires more width, per IBC section 1005.1. <br />SABA Response: See attached Architectural drawings A2.3, A2.4. <br />c. Emergency lighting shou/d be shown on the drawings, per IBC section <br />1006.1, where two exits are required. <br />SABA Response: See attached Architectural drawings A2.5, A2.6. <br />d. I//uminated exit signs shou/d be shown on the drawings, per IBC section <br />1011.1, where two exits are required. <br />SABA Response: See attached Architectural drawings A2.5, A2.6. <br />Construction: <br />1. P/ease include new tloor p/ans showing new and existing work for the fe/%wship <br />rooms, sanctuary, and a building section through those areas showing new and <br />existing construction, inc/uding ceilings and roofre�isions. <br />SABA Response: See attached Architectural drawings A2.3, A2.4 & <br />A3.1. <br />2. P/umbing fixture calculations shou/d be submitted to show compliance with <br />Chapter 29 of the IBC, based on the scope of the tenant improvement. <br />SABA Response: There is no increase in occupant load therefore there <br />is no plumbing fixture calculations. <br />3. New drawings are required to show the rep/acement of the fixtures in the <br />required toilet rooms, and other reuisions that may be required after the <br />demolition shown on sheet A4, permit B1305-014. <br />SABA Response: See attached Architectural drawings A2.3, A2.4 <br />existing fixtures will be replaced at there original locations, except first <br />floor sinks will be relocated per plans to improve the restroom <br />accessibility . <br />4. The reuised f/oor p/an shou/d show the use and occupant /oad for the area north <br />of the sanctuary, where most of the existing walls have been removed, per the <br />recent permit B1305-024. <br />SABA Response: See attached Architectural drawings see A1.2, A2.3, <br />A2.4 . <br />Eastlake Community Chu�ch 3 oi5 Aug. >2, 20>3 <br />B1307-015 <br />