Laserfiche WebLink
SABA Response: There are no changes to building envelope. <br />Upon resubmission of the drawings, p/an reuiew will resume and your application wi/l be <br />given priority. Al/ required submitta/s must be ofsufficient detai/ and information <br />to ensure that the proposed structure wil/ be constructed in compliance with all <br />adopted codes. <br />These comments address building issues only, Re�isions or additions may be required <br />by other departments (Utilities, Public Works, or P/anning). Code references cited <br />inc/ude the ZOIZ Internationa/ Building Code (IBC), ZOIZ Internationa/ Fire Code (IFC), <br />the 2012 Internationa/ Mechanica/ Code (IMC), the 2012 Uniform P/umbing Code (UPC), <br />the 2012 Washington State Energy Code (WSEC), and the ICC/ANSI A117.1-2009 <br />Accessible and Usable Buildings and Facilities. All codes referenced, as adopted by the <br />City of Everett, should include current revisions by the State of Washington. <br />Respectfully Yours, <br />, �� �� <br />/�---,�'--- ; �� ; <br />�/`�;�-'��-�-`._� <br />Stephen Wood <br />Architect <br />Eastlake Community Chu�ch 5 of 5 Aug. 12, 2013 <br />B1307-015 <br />