• Three hard copies of the draft Feasibility Study Report <br /> • Three hard copies of the final Feasibility Study Report <br /> Work Element 3 60% Plans & Estimate: <br /> Activities associated with this work element include advancing the desired building access <br /> alternative to the 60% design level. Our preliminary assessment has revealed the following plans <br /> are required for the construction bid set for each alternative: <br /> 1. Pedestrian Bridge Alternative <br /> a. Cover Sheet <br /> b. Plan, Elevation, & Section <br /> c. Building support details <br /> d. Abutment support details <br /> e. Roof railing modification details <br /> 2. Stairwell Alternative <br /> a. Cover Sheet <br /> b. Plan, Elevation, & Section <br /> c. Foundation details <br /> d. Stair details (2 Sheets) <br /> e. Roof railing modification details <br /> In this work element, the design team will prepare and submit for the City and WFP officials <br /> review, 60% plans and engineer's opinion of cost <br /> Deliverables: <br /> • Three hard copies of the draft 60% Plans and Estimate documents <br /> • Three hard copies of the finalized 60% Plans and Estimate documents <br /> All engineering work associated with the design of the pedestrian bridge alternative, if chosen, <br /> will be performed per AASHTO LRFD Bridge Design Specifications,WSDOT Standard <br /> Specifications 2016 M41-10, WSDOT Bridge Design Manual M 23-50.04, August 2016 and the <br /> current City of Everett Standards. <br />