My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 12/5/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
TranTech Engineering LLC 12/5/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2016 10:04:19 AM
Creation date
12/23/2016 10:04:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
12/5/2016
Council Approval Date
11/30/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
Ed Fisher
Subject / Project Title
Screen House Bridge Replacement
Tracking Number
0000398
Total Compensation
$31,500.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Element 4 100% Plans,Specifications, & Estimate: <br /> This work element encompasses all the activities associated with the preparation of the 100% <br /> Plans Specifications &Estimate (PS&E)construction documents. <br /> In this work element, the design team will prepare and submit for the City and WFP officials <br /> review, 100% PS&E construction documents. <br /> Deliverables: <br /> • Three hard copies of the draft 100% PS&E Documents <br /> • Three hard copies of the finalized 100% PS&E Documents (includes half size Plans) <br /> • One set of full size signed and stamped of finalized Plans <br /> • Set of electronic Auto.CAD files per City of the Everett standards. Base drawing <br /> containing design and all plan sheets (i.e. plot styles, line type, text styles, x-refs, <br /> etc.). <br /> Work Element 5 Engineering Support During Construction Phase: <br /> This work element, at the option of the City of Everett, encompasses all the activities associated <br /> with providing engineering support during the construction phase of the project. These activities <br /> include; bidding phase support, responding to contractor RFIs and submittals, site visits, creation <br /> of as-builts, etc. <br /> Deliverables: <br /> • Construction phase support <br /> • As-built submittal <br />
The URL can be used to link to this page
Your browser does not support the video tag.