My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/01/15 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/01/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 11:22:35 AM
Creation date
1/4/2017 11:22:26 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/15/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
: <br /> a <br /> MEMORANDUM OF AGREEMENT <br /> THIS MEMORANDUM OF AGREEMENT is entered into by and between the Silver <br /> Lake Water District, a utility district organized under the laws of the State of Washington (the <br /> "District") and the City of Everett, a first-class charter city organized under the laws of the State <br /> of Washington (the "City"), for the purposes of identifying certain agreement by and between the <br /> District and the City regarding the design of certain water distribution facilities to be replaced <br /> along SR 527 (and vicinity), between 112th Street and 132nd Street. <br /> RECITALS <br /> A. The City and the Washington State Department of Transportation (WSDOT) have <br /> planned arterial improvements along SR 527, between 112`h Street and 132nd Street. <br /> B. The District has potable water facilities and appurtenances along or in the vicinity of SR <br /> 527, between 122nd Street and 132nd Street. <br /> C. The City and the District have determined that a portion of the District's water line within <br /> SR527 street-widening project limits must be replaced, due to the roadway <br /> reconstruction. Specifically, the District's existing twelve-inch-diameter cast iron water <br /> line from the vicinity of 132nd Street SE to the vicinity of 122nd Street SE will not have <br /> adequate cover during the duration of construction activities. Consequently, a total of <br /> approximately 3,000 feet of the District's water main must be replaced with ductile iron <br /> pipe. <br /> D. In order to accommodate the future relocation of Master Meter No. 3, it has also been <br /> determined that certain vault and plumbing improvements need to be made as part of the <br /> SR 527 street improvement project. <br /> E. The City and the District have determined that it will be most convenient and cost- <br /> effective to replace the water lines and the master meter vault ("the Project") as part of <br /> the SR527 street-widening project, rather than as a separate project. <br /> F. The District and the City desire, in this Memorandum of Agreement, to identify their <br /> respective responsibilities relating to the design the Project. <br /> 1n <br /> - i - <br /> BNC\3221\81\352904.V01 (7K@WO1!.DOC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.