My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2017 8:27:54 AM
Creation date
1/6/2017 8:27:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/15/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> 6. As the design of the pipeline proceeded based on Alternative Route#1 as shown in the <br /> Alternatives Evaluation Report, a less costly route became evident. The alternative route <br /> following Everett Avenue rather than 25th Street will reduce the length of the section to <br /> be tunneled under the railroad tracks and will minimize work in wetlands. Evaluation <br /> of the alternative route along Everett Avenue will require additional geotechnical <br /> exploration (two borings) and additional survey&mapping. <br /> 7. City staff has requested that the 30 percent design of the pump station be revised to <br /> show the pump station facilities located on top of the existing CCC. This work will <br /> include an inspection of the CCC, revisions to the 30%documents, revisions to the <br /> opinion of probable cost, and providing a recommendation regarding coating of the <br /> walls. <br /> Schedule <br /> As a result of the items listed above,modifications to the schedule are necessary. The <br /> modified schedule for final design,bidding services, and pipeline evaluation is shown <br /> below: <br /> Notice to Proceed February 2002 <br /> Surveying and Geotechnical Exploration February 2002-July 2002 <br /> Submittal of 30%Design Package May 2002 <br /> Submittal of 60%Design Package September 2002 <br /> Submittal of 90%Design Package November 2002 <br /> Final Design Submittal Early January 2003 <br /> Bid Advertisement-Crosstown Pipeline Early January 2003 <br /> Bid Advertisement-Effluent Pump Station Early January 2003 <br /> Evaluation of Existing Pipeline Second Quarter 2003 <br /> Task 5. Final Design Modifications <br /> Addendum No. 1 to the Scope of Work, dated February 2002,included Tasks 1 through 4. <br /> This addendum adds Task 5. Task 5 includes seven subtasks as described below: <br /> • Subtask 5.1-Evaluation of alternatives for electrical equipment enclosure. <br /> • Subtask 5.2-Evaluation of installing pumps within the existing CCC. <br /> • Subtask 5.3-Evaluation of Grand Avenue &26th Street alignment. <br /> • Subtask 5.4-Evaluation of river diffuser capacity. <br /> • Subtask 5.5-Design of manhole repair. <br /> • Subtask 5.6-Evaluation of Pipeline Alignment along Everett Avenue. <br /> • Subtask 5.7-Prepare revised 30%Pump Station design with the pumps installed in <br /> the existing CCC. <br /> 1g 20F5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.