Laserfiche WebLink
6 <br /> 1111111111116. <br /> EXHIBIT A <br /> SCOPE OF WORK <br /> 6.2 Construction specifications. <br /> 6.3 Develop an Opinion of cost,Schedule,Permits. <br /> 6.4 Coordinate Structural Engineer,Landscape Architect,Signage graphic designer and lighting designer. <br /> 7 Construction Administration <br /> 7.1 Shop drawing review <br /> 7.2 On site observation <br /> SUB-CONSULTANTS INCLUDED IN SCOPE OF SERVICE <br /> 1. Structural Engineering for new Everpark Gateway structures and sign for Everpark <br /> (Structural Engineering does not include seismic upgrade to existing structures.) <br /> 2. Conceptual Lighting Design. <br /> 3. Graphic and signage designs <br /> OPTIONAL SERVICES <br /> The following optional services may be provided as needed. Scope of services and fee determination will be <br /> negotiated separately as a supplement to this Agreement. <br /> 1. Additional public involvement meetings,if more than one is needed. <br /> 2. Watercolor renderings. <br /> ADDITIONAL SERVICES <br /> The following are typical additional services,when approved by the owner. Consultants may contract directly with <br /> the owner or through this agreement. If included in this agreement the cost will be consultant's active costs plus 5% <br /> markup. <br /> Electrical Engineering <br /> Design/Build <br /> Mechanical Engineering <br /> Design Build/By owner <br /> Fire Sprinkler <br /> Design BuildBy owner <br /> Geotechincal <br /> By owner <br /> Landscape Architect <br /> Design Build/By owner <br /> Civil Engineering <br /> Design Build/By owner <br /> TIME FOR PROJECT COMPLETION <br /> All work under this contract shall be completed by February 27,2004. <br /> MINIMUM NOTICE OF MEETING REQUIRING CONSULTANT PARTICIPATION <br /> The Consultant will normally be given a minimum of 24-hour notice of required meeting attendance. <br /> ITEMS TO BE PREPARED AND/OR FURNISHED BY THE CONSULTANT <br /> 1 Preliminary concept design drawings: 5 copies <br /> 2 Final schematic design drawings: 5 copies <br /> 3 Final design development drawings:5 copies <br /> 4 Final construction document set: 5 copies <br /> 5 Presentation graphics: 5 copies <br /> 6 One scale model <br /> 23 <br /> 9 <br />