My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/09/03 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/09/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 10:12:03 AM
Creation date
1/13/2017 10:11:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/3/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> 8. TI RFI's on shell design to PCL: <br /> A. 16 TI RFI's to PCL: <br /> • Start 12/03/02 End 04/23/03 <br /> • 27 file documents, 100 pages 5 hrs <br /> • Research 16 RFI's 31 hrs <br /> • Narrative and/or drawings for 16 RFI's 34 hrs <br /> • Faithful & Gould, estimating consultant 12 hrs <br /> • Design coordination and management 12 hrs <br /> • Total 94 hrs $10,460.00 <br /> 9. Response to PCL's RFI's: <br /> A. Responses to requests for assistance and clarifications from the shell <br /> contractor to allow them to coordinate shell work with future TI work. <br /> • Start 01/09/03 End 06/18/03 <br /> • 20 file documents, 100 pages 4 hrs <br /> • Research 17 hrs <br /> • Narrative and/or drawings for 15 replies 34 hrs <br /> • Faithful & Gould, estimating consultant 8 hrs <br /> • Design coordination and management 12 hrs <br /> • Total 75 hrs $8,330.00 <br /> 10. Other clarification/coordination issues with PCL: <br /> A. Plumbing for the shell, how was the rough-in to be done? <br /> • Review and analysis, `3ivclH o hrs <br /> • Faithful & Gould, estimating consultant 25 hrs <br /> a CDI Engineers 16 hrs <br /> • Total 47 hrs $5,420.00 <br /> B. HVAC for the shell, what was the extent of the HVAC to be run? <br /> • Review and analysis 6 hrs <br /> • Faithful & Gould, estimating consultant 15 hrs <br /> • Total 21 hrs $2,460.00 <br /> C. Some of the runs noted above did not cover what was agreed to be covered <br /> by PCL: <br /> • Review and analysis 6 hrs <br /> • Total 6 hrs $660.00 <br /> D. ADA door operators at outer lobby: <br /> • Start 05/22/03 End 06/06/03 <br /> • 18 file documents, 50 pages 4 hrs <br /> • Research 3 hrs <br /> • Narrative reply to PCL RFI 6 hrs <br /> • Total 13 hrs $1,430.00 <br /> amendment <br /> - Page 4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.