My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/09/03 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/09/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 10:12:03 AM
Creation date
1/13/2017 10:11:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/3/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> 11. Shell fire alarm: <br /> A. Review extent of shell system and its interface with TI system <br /> • Specific file records are interwoven into <br /> other categories of work <br /> • Review and analysis 6 hrs <br /> • Total 6 hrs $660.00 <br /> 12. Coordination with LMN/PCL and shell shop drawing review: <br /> A. Shell stairs <br /> • Stair 10 size and positioning 6 hrs <br /> • Faithful & Gould, estimating consultant 2 hrs <br /> • Total 8 hrs $900.00 <br /> B. Shell stair handrails/guardrails <br /> • Start 04/11/03 End 06/06/03 <br /> • 30 file documents, 80 pages 6 hrs <br /> • Sketches 6 hrs <br /> • Shop drawing review and revision sketches 7 hrs <br /> • Total 19 hrs $2,090.00 <br /> C. Shell stairs granite <br /> • Shop drawing review and revision sketches 6 hrs <br /> • Total 6 hrs $660.00 <br /> D. Structural steel at HVAC openings <br /> • Research/coordination 5 hrs <br /> • Sketch drawing 6 hrs <br /> • CD drawing 6 hrs <br /> • Structural consultant design and drawing 5 hrs <br /> • Total 22 hrs $2,420.00 <br /> 13. Shell code analysis: <br /> A. Analysis to allow for the maximum capacity for the banquet room space, <br /> including sizing of the grand stair, and other life safety code issues for the <br /> Conference Center Building: <br /> • Start 10/24/03 End 11/25/03 <br /> • Code research and design sketches 11 hrs <br /> • Design coordination and management 9 hrs <br /> • Total 20 hrs $2,200.00 <br /> [ 0 <br /> Amendment <br /> - Page 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.