My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/09/03 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/09/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 10:12:03 AM
Creation date
1/13/2017 10:11:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/3/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Arts Commission coordination and revisions: <br /> A. Artwork was selected in April; BN&H had to add light fixtures and outlets to <br /> accommodate the art. <br /> • Specific file records are interwoven into other categories of work <br /> • Interior consultant research and drawing 10 hrs <br /> • Electrical consultant redesign and drawings 18 hrs <br /> • Design coordination and management 6 hrs <br /> • Total 34 hrs $3,740.00 <br /> 15. Change order and additional Administration Consultation work: <br /> A. Kitchen — revisions and support actions beyond those outlined in item 5: <br /> • Start 04/28/03 End 06/27/03 <br /> • 230 file documents, 300 pages 38 hrs <br /> • Research, clarifications 16 hrs <br /> • Special drawing sets 8 hrs <br /> • Sparling Engineers 20 hrs <br /> • Consultant support, CDi 31 hrs <br /> • Faithful & Gould, estimating consultant 20 hrs <br /> • Design coordination and management 16 hrs <br /> • Total 149 hrs $16,690.00 <br /> B. Out[of Sequence work - Electrical boxes in upper floor <br /> ▪ Stall 12/04/02 End 12/16/02 <br /> • 50 file documents, 100 pages 8 hrs <br /> • Dimensioned drawing, study and CAD drawing 8 hrs <br /> • Design coordination and management 4 hrs <br /> • Total 20 hrs $2,200.00 <br /> C. HVAC units on roof, evaluating contractor's alternate proposals: <br /> • Specific file records are interwoven into other categories of work <br /> • Mechanical consultant research 8 hrs <br /> • Mechanical consultant recommendations 8 hrs <br /> • Design coordination and management 6 hrs <br /> • Total 22 hrs $2420.00 <br /> D. Roof curbs and acoustical curbs: <br /> • Start 03/27/03 End 04/09/03 <br /> • 34 file documents, 100 pages 7 hrs <br /> • Research 5 hrs <br /> • Mechanical consultant research 6 hrs <br /> • Design coordination and management 5 hrs <br /> • Total 23 hrs <br /> $2,530.00 <br /> Amendment <br /> - Page 6 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.