My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5785
>
Resolutions
>
Resolution 5785
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2017 9:37:51 AM
Creation date
1/17/2017 9:37:18 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5785
Date
6/27/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 3 Six-year Transportation Improvement Program <br /> Agency Everett From 2007 to 2012 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC <br /> Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B.Bridge No. Federal Funding Local Agency <br /> C.Project Title - - - - R/W <br /> D.Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E.Beginning MP or road-Ending MP or road meet Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thin Envir. Date <br /> Class Number F.Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2007) (2008) (2009) 6th Type (MMM') <br /> 1 2 3 4 5 67 8 9 10 11 12 13 14 15 18 17 18 19 20 21 <br /> 14 5 2 phases in project 12 S 00 C PE 1/12007 STP(S) 135 135 135 CE <br /> Principal P CN 3/12008 STP(S) 765 765 765 <br /> Arterial (HES)Projects(Broadway/52nd St.;S.Broadway T <br /> at 52nd St&at Madison St;entrances to Forest 0 <br /> Park on Mukilteo Boulevard) <br /> Various safety,signal related improvements Totals _ 900 900 135 765 0 0 <br /> 14 6 3 phases in project 8 P 0.25 C PE 1/1/2009 AIP 250 250 500 500 <br /> Principal P RW 6/1/2010 AIP 500 500 1,000 1,000 <br /> Artenal Pacific Avenue/BNSF Grade Crossing Improvements T CN 6/12012 AIP 2,250 2,250 4,500 4,500 <br /> Pacific Avenue and Chestnut Street 0 <br /> N/A to N/A _ _ <br /> Grade separation over BNSF rail line Totals 3,000 3,000 6,000 0 0 500 5,500 <br /> 14 7 1 phase in project 31 P 0 C PE 9/1/2007 75 75 75 <br /> Principal P <br /> Arterial Rucker Avenue/W.Marine View Dr.Connection Study T <br /> Rucker Avenue,W.Marine View Dr. 0 <br /> N/A to N/A <br /> Study alternatives for new arterial connection Totals 75 75 75 0 0 0 <br /> 14 8 1 phase in project 31 P 0 C PE 1/1/2007 135 135 135 <br /> Principal P <br /> Arterial CBD Comprehensive Transportation Plan T <br /> Various Arterials within City's Central Business Dist. 0 <br /> N/A to N/A <br /> Study improvement needs for downtown core Totals 135 135 135 0 0 0 <br /> 14 9 1 phase in project 31 P 0 C PE 1/12011 200 200 200 <br /> Principal P <br /> Arterial Interstate 5 to Port of Everett Truck Route Plan T <br /> Various Arterials within City's Central Business Dist O <br /> N/A to N/A <br /> Study alternative truck routes between Port and 1-5 Totals 200 200 200 0 0 0 <br /> 14 10 1 phase in project 31 P 0 C PE 2/1/2007 200 200 200 <br /> Principal P <br /> Arterial Arterial Needs Studies T <br /> Various Arterials within City Limits 0 <br /> N/A to N/A <br /> Study improvement needs-various classes of arterials Totals 200 200 200 0 0 0 <br /> 14 11 2 phases in project 31 P 0 C PE 2/1/2008 50 50 50 <br /> Principal P CN 4/1/2009 350 350 350 <br /> Arterial Arterial Streetscaping Improvements T <br /> Various Arterials within City Limits 0 <br /> N/A to N/A <br /> Streetscaping improvements-various classes of arterials Totals 400 400 0 50 350 0 <br /> 16 1 3 phases In project w/2 CN phases 4 S 1 C PE 1/12002 AIP 238 194 432 <br /> Minor P RW 5/1/2003 AIP 743 607 1,350 <br /> Arterial 112th Street SE Improvements T CN 6/30/2004 AIP 2,100 1,716 3,816 400 <br /> 112th Street SE 0 <br /> 3rd Avenue SE to west side I5 R-O-W W <br /> Design,construct 5 lane street with bike&ped improv. Totals 3.081 2,517 5,598 400 0 0 0 <br /> 16 2 2 phases in project 4 S 1 C PE 1/12002 AIP 431 796 1,227 <br /> Minor P RW 7/1/2005 AIP 666 54 720 EA YES <br /> Arterial 112th Street SE IS bridge widening T CN 8/1/2006 AIP 4,053 4,400 8,453 3,500 3,970 3/12006 <br /> 112th Street SE 0 CN 8/12008 STP(U) 2,500 2,500 <br /> 112th Street SE at Interstate 5 W <br /> Design,construct 5 lane street with bike 8 ped improv. Totals 2,500 5,150 5,250 12,900 3,500 3,970 0 0 <br /> 16 3 3 phases in project 4 S 1 C PE 1/12007 STP(U) 103 AIP 155 258 258 <br /> Minor P RW 3/1/2008 STP(U) 1100 AIP 1,850 2,750 2750 MCE YES <br /> Arterial 112th Street SE Improvements T CN 7/1/2009 STP(U) 760 AIP 1.138 1,898 1.898 3/12009 <br /> 112th Street SE 0 <br /> Silver Lake Road to SR 527 W <br /> Design,construct five-lane street,bike,and ped improv. 1,983 2,943, 0 4,906 258 2,750 1,898 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.