Laserfiche WebLink
� 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and >3 story R2 and R3 <br /> 0 Mechanical Plans ❑ MECH-EQ Form <br /> • Mechanical Schedules Indicate location of equipment compliance information. If provided on plans then MECH-EQ forms are not required, <br /> however, include on plans all applicable compliance information listed in MECH-EQ tables. <br /> ' Q Load calculation summary ❑MECH-LOAD-CALC Form ❑ Equipment retrofit or repair <br /> Provide design load calculations for all mechanical systems and equipment serving the building heating, cooling or <br /> . Desi Load Calculations ventilating needs. If a load calculation summary is provided with the permit documents that includes all applicable <br /> � compliance information then the MECH-LOAD-CALC form is not required. <br /> Equipment retrofit and repair projects where design loads in space(s)served have not changed from original design <br /> conditions are not required to perform load calculations. <br />