My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2205 BROADWAY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
2205
>
2205 BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 12:53:35 AM
Creation date
1/24/2017 12:52:14 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2205
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. ( <br /> This MDNS is issued under 197-11-355 and a fourteen (14) day public comment period <br /> for this proposal has been completed. <br /> Responsible O�cial: Paul A. Roberts <br /> Title: Planning and Community Development Director <br /> Address: 2930 Wetmore Avenue, Suite 8-A, Everett, WA 98201 <br /> Date: DE;.ember 5, 2002 /� <br /> � <br /> Signature: � ;�• ,Gc'1 ��� �✓` `'1 . \�� /'�'��J— <br /> 6� � <br /> You may appeal this determination by filing an appeal on forms provided by the <br /> Planning Department and a fee to the Planning/Community Development Permit <br /> Services Counter at 3200 Cedar Street, 2nd Floor, no later than 14 days from the date <br /> the MDNS becomes final (which is after the 14-day comment period). <br /> Contact Faheem Siddiq to read or ask about the procedures for SEPA appeals. <br /> Notes <br /> 1. A MDNS may be withdrawn in the event of significant changes in the proposai, <br /> disclosure of new significant information, misrepresentation by the applicant, or <br /> failure to comply with the conditions upon which this Determination of Non- <br /> Significance is predicated. <br /> 2. This land use permit shall terminate if applicant does not apply for a building <br /> permit within 18 months (or, with an extension, 24 months), except where a <br /> time limit on the land use permit is othenvise established under federal or state <br /> law, city ordinance, or an executed development agreement. <br />' INFORMATION FOR DEVELOPER; <br /> The following information is provided for the developer's benefit. These are not SEPA <br /> conditions but are associated with other laws or requirements. All requirements are <br /> preliminary in nature, and are based upon the preliminary site plan and the ordinances <br /> in effect at time of submittal for SEPA review. The proposal must comply with all <br /> ordinances in effect at the time a complete building permit application is filed, <br /> including those not specifically set forth herein. (Exception: For vesting under the <br /> Zoning Code, please refer to Section 44 of the Zoning Code). Contact the Planning <br /> Department for informstion regarding appeals processes for the requirements listed in <br /> this document. <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.