My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
909 N BROADWAY 2018-01-01 MF Import
>
Address Records
>
N BROADWAY
>
909
>
909 N BROADWAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2018 2:58:44 PM
Creation date
1/24/2017 12:58:48 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
909
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parr 2 <br />✓ 5. Aithough the mechanical drewings were submitted, a mechanical permit application has <br />not yet been submitted and is required prior to review. - <br />We are submitting the application with the revised drawin m i N �oJerreJ ��rM �� <br />Occupaiuy <br />�/1. f= �ase update the code analysis to include the occupant load of'B'- business on the <br />upper floor for both the exiting and plumbing fixture count, based on: <br />a. The structurel calculations indicate a'B' use. <br />b. The existing and future accessible route indicates a'B' use. <br />c. The new mechar�ical equipment appears to be primarily on the roof. <br />Requested information is induded on the revised drawings <br />�2. The total occupant load for the first floor and projeded load of the second (loor should <br />be shown on the site and building data section of the cover sheet. <br />a. The anticipated occupant load for the'B' use on the second floor should be <br />included on the cover sheet. <br />Requested information has been included on the revised drawings <br />�3. The total occupant load for plumbing fixtures should be revised to be the same as the <br />occupant load of lhe Floor, per IBC sedion 2902.1. The required fixture count shouid be <br />based on the requirements of this section for the oa�pancy type served, now or in the <br />future. <br />Requested informatior. has been induded on the revised drawings. The cover sheet also <br />notes that" W1TH THE h1ANDATED INSTRUCfION CAP ON STUDENTS IN EACH OF THE <br />VOCATIONAL lABS, SHOPS AND CLASSROOh1S INCLUDED FOR THE PROGRAMS IN THE <br />BUILD OUT AREA, EVERETl' COMMUNI7Y COLLEGE WILL NEVER REACH THE <br />OCCUPANT LEVELS DERNED STRICTLY BY CODE" <br />✓9. The future plumbing fixture count on the second floor should also be induded, even if it <br />will not be construded under this permit. <br />a. Toilets will be required on the second floor, per IBC sedion 2902.1, now or in <br />the deferred building permit. Please indicate if the plumbing will be included as <br />part of the shell construdion. <br />Plumbing for the deferred mezzanine T.I. is noted as not indudcd in this permit <br />�Egress <br />v 1. Please clarify the building egress inside the building and on an architedural site plan, <br />per IBC sedion 1021. <br />a. The site plan should indude property lines and the route to the public way, per <br />IBC sedion 1027. <br />Requested information has been included on A1.0 <br />b. Doors meeting the requirements for egress should be shown on the drawings, <br />per IBC section 1008. <br />Requested information is located on sheet T1.2 and the Generel Hardware notes <br />found an sheet A9.1 <br />c. Please indicate travel distance and occupant loads within the building, and the <br />paths to egress, per IBC sedions 1021 and IBC table 1004.1.2. <br />Maaimum travel distance from the farthest point to each exit fias been noted <br />next to each exit on sheet T1.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.