Laserfiche WebLink
i. Modify the area co minimize the Putentid for aviation fuel spills to <br /> enoer the scormaarct drain.ge system. by impiementing source wntrol <br /> opdons such as the roilo•+�in¢. The detailed desi�jn shai! be nviewed <br /> and approved by the Pcesponsibie Official. <br /> • insnll a second set of coalescing plates in the ezisring fuel separator <br /> tanic to sern runotf from all eusting fueling stalls: <br /> • install new coalescing plate uparator to serve surface runoff from two <br /> new fueling stalls: <br /> • insWl a stormwater cut-off vench on the south side of the airpiane <br /> wing fueling poru for the thra existing �FI through F31 and two new <br /> (F4 and FSl fuelir:g s�alls: <br /> • install piping �•alving and an au�nmaud control sys�em to divert dn•- <br /> weather runoii to a haldin¢ tank for penodic pump-ouc. <br /> Altemauvely, undenake a technical analysis and develop a plan tnat <br /> provides equal or bettcr prouxtion of tha suriace waters: aiur review <br /> by the Responsibie Of6cial, implement the stipulated measures. <br /> ii. Provide an ongoing employa tiaining program to minimiu thc <br /> number of accidental fud spill incidences. <br /> iu. Provide a spill control plan ro control spills when they occur. <br /> iv. Develop an emergency response plan for review and approval by the <br /> City and agencia wich jurisdicdon. The emergency response plan <br /> must include measures for msponding to ciciu++ complainu regarding <br /> fuel or foam spills in[o che cmk. <br /> (2) Noiu - Engine Run-Up Tating: (Envirnnmeen�He.►�h) <br /> In orda to minimize the exposure of citizens co the harmful effxts of <br /> excessive noite, Boeing shall: <br /> i. Submit to the Responsible Official a detailed professional engineering <br /> design to fill in gaps, raise the height, or otherwisc modify berms or <br /> pmvide new berms. <br /> The design shall ba reviewai and approved, and consuvction <br /> completed, prior to commencement of 777 engine run-up usting. <br /> ii. Lacate and select stations for testing to minimizc noise impacts. <br /> 30 <br />