Laserfiche WebLink
DOEING FUEL DOCK- TRENCH DRAIN JULY 1994 <br /> A. All submittals shall be addrused to recipient indicated in Section 01010. Refer ro <br /> attached transmittal forms as applicable. <br /> B. Receive, check, approve as required, and submit ail items required by the Contract <br /> Documents. <br /> C. Maintain aceurate rceord log of dates sent and received for all submittals. Provide the <br /> Engincer and Owner access to such log. <br /> D. Construction Schedule: Submit bar chart schedule for approval. <br /> E. Progress Reports: Submit weekly report and indicate percentage of completion of <br /> actual progrcss. <br /> I <br /> F. Schedule Updating: Revise schedule after each meeting or activity, where revisions <br /> have bcen recogniud or made. Issue updated chronological schedule concunently <br /> with report or each meeting. <br /> l.4 INITIAL SUBMITfALS <br /> A. Except as otherwise rec,�ired by the Contract Documents, the (ollowing is generai list <br /> of requircd submittals and time frame for submitting. <br /> B. Prior to Date of Owner-Contractor Agteement: <br /> 1. Items as requited by the Bidding Documents. <br /> 2. Proposed Subcontractors list. <br /> C. Prior to Commencement of Work: <br /> 1. Ceniftcates of Insurance. <br /> 2. Installer Certificates. <br /> 3. Perfomiarice and Labor and Material Payment Bonds if required. <br /> D. Prior to fitst Application for Payment and within time limits established elsewhere in <br /> the Contnct Documents: <br /> 1. Final Subcontractor and Supplier List. , <br /> 2. Contractor'a Construction Schedule. <br /> 3. Schedule of Values. <br /> 1.5 AS WORK PROGRESSES: <br /> A. Updated Contractor's Construction Schedules. <br /> B. Affidavit and Waiver of Licn. <br /> C. Daily Construction Reports. <br /> SUBMI7"fALS 01300 - 3 <br />