BOE1N FUEL DOCK- TRENCH DRAIN JULY 1994 <br /> D. Compiiance Submittal <br /> 1.6 PRIOR TO REQUEST FOR FINAL PAYMENT (As required): <br /> A. Record, Testing and Inspection and as built documents per section 1700. <br /> , B. Complete package of Shop Drawings and Product-Data. <br /> C. Final Affidavits and Waivers of Lien. <br /> D. Certificate of]nspection. <br /> I <br /> 1.7 COMPLIANCE SUBMITTALS: <br /> p. Included Informetion: Items shall include but not be limited to, the following: <br /> 1, Manufacturet's spccifications. <br /> 2, Shop fabtication and erection drawings. <br /> 3. Concr:te mix design infortnation. <br /> 4. All drawings, catalogs or pa�ts chereof, manufacturer's specifications and data, <br /> samples, instruccions, and other infom�ation specified or necessary. <br /> a. For Engineer to detecmine that the equipment ard materials wnform <br /> with the design concept and comply with the inG:nt of the Contract <br /> Documents. <br /> b. For the proper etection, installation, operation and maintenana of the <br /> cquipment and materials which the Engineer will review fot general <br /> content but not for substance• <br /> c. For Engineer to determine what supports, anchoraBes. stnictural <br /> details, connxtions and services aro required for the equipment and <br /> materials, and the effeccs on contiguous or related swctures, <br /> equipment and materiais. <br /> B. Submittal Processing: <br /> 1, pllow sufficient review time so that installation will not be delayed as result <br /> of time requirod to Proass submittals, including time for resubmittals. <br /> 2, Allow minimum of 10 daye for review from date Submittal Reviewer receives <br /> submittal until date it is sent back. Allow additional time if processing must <br /> be delayed to petmit cootdination with subsequent eubmittals. Submittal <br /> Reviewer will advise the Contractor when a submittal being processed must be <br /> delayed for coordination. <br /> 3, if intermediate submittal is necessary, process same as initial submittal. <br /> 4. Nrensmic submittels torSubmittal R v ewertsuff�ntl�y in advanceuof the work <br /> to pertnit processing. <br /> 5, L.ate or untimely submittals shall not be cause to reduce Submittal Reviewer's <br /> review time, to accept lower qualiry, or ro delay project completion. <br /> 01300 - 4 <br /> SUDMITTALS <br />