Laserfiche WebLink
DOBING FUEL DOCK- TRENCH DRAIN JULY 1994 <br /> 1. Callect product data into single submittal for each element of construction or <br /> system. Product data includes printed information such as manufacturer's <br /> installation instructions, catalog cuts, atandard wlor charts, roughing-in <br /> diagrams and templates, standard wiring diagrams and perfortnance curves. <br /> Where product data must be specifically prepared because standard printed <br /> data is not suitable for use, submit as Shop Drawing. <br /> 2. Mark each submittal to show applicable choices and options. Where printed <br /> product data includes information-on several products, some of which are not <br /> required, mark copies ta indicate applicable information. Submit only those <br /> cetalog pages showing required item. <br /> 3. Submit six copies. <br /> 4. Mark each copy to identify products, models, options, and other data. <br /> Supplement manufacturer's standard data to provide information unique to this <br /> project. <br /> 5. After review, distribute in accordance with article on submittal procedures <br /> above and provide copia far Record Documents. <br /> N. Engineer's Review: <br /> 1. Engincer will review and rcturn Compliance Submittals to Contractor with <br /> appropriate notations. Irtstruction books and similar submittals will be <br /> reviewed by Engincer for general content but not for substance. <br /> 2. Engineer's acceptance of Compliance Submittals will not relieve Contractor <br /> from his responsibiliry u stated in the General Conditions. <br /> O. Compliance Submittal Action Stamp: Engina�r's review action atamp, apptopriately <br /> completed, will appear on all Compliana Submittala of Contnctor when retumed by <br /> Engincer. Review status designations listed on Engineer'a action atamp are defined as <br /> follows: <br /> 1. NC PXCEPTIONS TAKEN signifies equipment or material represented by <br /> the submittal confomu with the design concept and complies with the intent of <br /> the Contract Documents. Contnctor is to proceed with fabrication or <br /> procurement of the items and with related work. Copies of lhe submittal are <br /> to be transmitted to Enginar for (nal distribution. <br /> 2. MAKE CORRECTIONS NOTED (RESUBMI7� signifies equipment or <br /> material repraented by the submittal confortns with the design concept and <br /> complies with the intent of the Contract Documents in accordance with <br /> Enginar's notations. Contractor is to proceed with fabrication or <br /> procurement of the items and with related work in accordance with Engincer'a <br /> notations and ia to submit a reviscd submittal responsive to notations mazked <br /> on the retumed submittal or written in the letter of transmittal. <br /> SUBMI7"fALS 01300 - 7 <br />