Laserfiche WebLink
BO�ING ^UEL DOCK- TRENCH DRAIN J LY 1994 <br /> 1. If, in the opiuion of the Submittal Reviewer, the item submitted does not meet <br /> with the intenr of the design or is not eyuivalent to the item specified, the <br /> Submittal may be disapproved. <br /> 2. Acceptance wiil be in the form o(a change order, credit or no cost. <br /> PART 3 - EXECUTION <br /> 3.1 GENERAL: <br /> A. Make submittals promptly, in accordance with aNproved schedule and in such <br /> sequence as to cause nu delay in tt�e.logical, nortnal order of the work. <br /> H. Where submittais affect the coordin�tion of more than ane trade, the Contractor shall <br /> submit for review any necessary composite drawings defining interdependent work. <br /> END OF S�CTION O1300 <br /> SUBMI'fTALS O1300 - 12 <br />