My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD DRAINAGE TRENCH FOR FUEL DOCKS 2016-01-01 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
DRAINAGE TRENCH FOR FUEL DOCKS
>
3003 W CASINO RD DRAINAGE TRENCH FOR FUEL DOCKS 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 2:11:57 PM
Creation date
1/25/2017 2:11:09 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
DRAINAGE TRENCH FOR FUEL DOCKS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�QE1NG FUEL DOCK - TRGNCIi DRAIN JIILY <br /> � <br /> SECTION 01700 - CONTRACT CLOSEOUT <br /> PART 1 - GENERAL <br /> 1.1 SUMMARY <br /> A. Definition: Closeout is defined to include requirements near end of Contract Time, in <br /> preparation for finai acceptance, final payment, nortnal tertnination of Contract, <br /> pccupancy by Owner, and similar actions evidencing completion of tlx Work. Time <br /> bf closeout is directiy rclated to "Substantial Completion," and thereforc may be either <br /> a single time period or entire Work or a seties of time periods for indlviduai parts o( <br /> the Work which have been certified as Substantially Complete at different dates. <br /> B. Related Documents: Drawings and general provisions of Contract, including General <br /> and Supplementary Conditions and Division 1 Specifications Sections, apply to this <br /> Section. <br /> 1.2 SUBSTANTIAL COMPLETION AND FINAL ACCEPTANCE <br /> A. Preliminary procedures for Substantial Completion and Final Acceptance, including <br /> inspection and reinspection procedures, are stared in the Generai Conditions o(the <br /> Contract. <br /> 13 PROJECT RECORD DOCUMENTS <br /> A. General: <br /> 1. In addition to requirements in the General Conditions, maintain at the site one <br /> record copy af the following for the Owner. <br /> a. Drawings. <br /> b. Specifications. <br /> c. Addenda <br /> d. Design Change Notice(DCN) and other Modifications ro the Contrect. <br /> e. Shop Dtawings, product data, and samples. <br /> f. Field test recocds. <br /> g. Inspection certificates. <br /> h. Manufacmror's certificates. <br /> B. Meintenance of Documents and Samples: <br /> 1. Stote documents end samples in Contractor's field office apart trom <br /> documents used tor constmction. Provide files, racks, and sceure srorage <br /> space for storage of documents and Samples. <br /> 2. Pield documents and Samples in accordance with specification tormat. <br /> CONTRACT CLOSGOUT 017IX1 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.