Laserfiche WebLink
BOEING FUEL DOCK - TRENCH DRAIN JULY <br /> 2 <br /> Contractor at site and will determine which (if any) of submitted Samples <br /> maintained by Contracror during progress of the work are to be transmitted ro <br /> Owner for record purposes. Camply with Engineer's instructions for <br /> packaging, identification marking, and delivery to Owner. <br /> 7. Miscellaneous Record Submittals: Refer to other Sections of these <br /> Specifications for requirements of miscellaneous recordkaping and Submittals <br /> in connxtion with�actual performance of the work. Immediately prior to the <br /> date or dates of Substantial Completion, complete miscellaneous records and <br /> place in good order, properly identifed and bound or filed, ready for <br /> continued use and te(erence. <br /> D. Delivery: <br /> 1 At Contract closeout, deliver record documents to Owner's Authoriud <br /> Representative. <br /> 2. Accompany Submittal with transmittal letter in duplicate containing: <br /> a. Date. <br /> b Contract name and number. <br /> c. Contractor's name, address, end telephone number. <br /> d. Number and title of each record document. <br /> e. Signsture of Contractor or his authorized representative. <br /> 1.4 WARRANTIES AND BONDS: <br /> A. Specified in Contract Generai Conditions and Section 01300. <br /> PART 2 -PRODUCTS (NOT USED) <br /> PART 3 - EXECUTION <br /> 3.1 CLOSEOUT PROCED��RES: <br /> A. Comply with procedures stated in General Conditions of the Contract for beneficiat <br /> occupancy. <br /> B. Owner will occupy adjacent buildinga of project site. Extra care must be taken to <br /> avoid interference with Owner's operations. <br /> C. When Contractor considers work has rwched final completion, submit wriiten <br /> certification that ^.ontract Documenta have been reviewed, work hns been inspected <br /> and that work is complete in accordance with Contract documents and ready for <br /> Owner'a Authorizal Representative inspection. <br /> CONTRACT CLOSEOUT O1700 - 3 <br />