My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD DRAINAGE TRENCH FOR FUEL DOCKS 2016-01-01 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
DRAINAGE TRENCH FOR FUEL DOCKS
>
3003 W CASINO RD DRAINAGE TRENCH FOR FUEL DOCKS 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 2:11:57 PM
Creation date
1/25/2017 2:11:09 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
DRAINAGE TRENCH FOR FUEL DOCKS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOGI�`G PUEL DOCK - TRGNCIi DRAIN JULY 1994 <br /> sampled in ; :cordance with ASTM C172, and test specimens shall be made in <br /> accordance with ASTM C31. <br /> E. The flexural strength of the concrete ahall mect the following requirements: <br /> 1. The average o(any four consecutive strength tests fortn any single day, tested <br /> at the end of 2R days shall be equal to or greased than the spccified flexural <br /> strength. <br /> 2. Not more than 20 percent of the beams tested at the end of 28 days shall have <br /> a flexural strength less than the specified strength. Specimens which are <br /> obviously defective shall not be considered in the dete�mination of the <br /> strength. �'✓hen it appears that the test specimens will fail to wnform to the <br /> requirements for strength, the Enginar shall have the right to order changes <br /> in the wncrete sufticient to increase the strength to mat thae req�iirements. <br /> F. When satisfactory relationships betwan thra-day and 28-day strengths, seven-day <br /> and 28 day strengths, and 14 day and 28-day strengths have ban established an <br /> approved, lhe thra-day, seven-day and 14 -day test results may be used as an <br /> indication of the 28-day strengths. However, the three day and seven�ay test results <br /> will not replacc the tesults of the 28-day test is the 28-day results fall below the <br /> requirement. Flexural atrcngths specimens will be made in accordance with ASTM <br /> C31 as specified above, and testes in accordance with ASTM C78. <br /> G. The cement concrete pavement placed in any day will be accepted as meeting strength <br /> requirements if the tut raults conform to lhe requirements specified above. If the <br /> tests for any day do not mcet the requirements specified above, the Engincer may <br /> order the Contractor to remove and rcplace all pavement placed duting that day, at <br /> no additional cost to the owner. <br /> 3.5 CONCRETE PLACEMENT: <br /> A. Comply with requirementa of Division 3 for mixing and placing concrete, and as <br /> herein specified. <br /> B. Do not place concrete until subbase and forms have ban checked for line and grade. <br /> Moisten aubbase if required to ptovide uniform dampened condition at time wncrete <br /> is pteced. Do not place concrete around manholes or other shucmres until they are <br /> at required finish olevation and alignment. <br /> B. Place concrete using methods which prcvent segregation of mix. Consolidate concrete <br /> along face of forms end adjacent to transverse joints wid� intemal vibrator. Keep <br /> vibrAtor a�vay from joint assembli�s, reinforcement, or side fotms. Consolidate with <br /> care to prevent dislocation of reinforcing, dowels, and joi.nt devices. <br /> C. Deposit and spread concrete in a wntinuous operation between transversc joints as iar <br /> a� possible. If intertupted for more than 1/2 hour, place a construction joint. <br /> PORTLANn CEMENT CONCRETE PAVING 02520 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.