Laserfiche WebLink
BOEING EVERETT SECTION 34 11 11 <br /> NEW RAIL SPUR BALLASTED TRACK CONSTRUCTION <br /> WORK ORDER 10-305 <br /> PART 4-MEASUREMENT AND PAYMENT <br /> 4 1 MEASUREMENT. Ballasted lrackwork construction will be measured for paymenl by the linear toot, <br /> complete in place, horizontelly atong the cenlerline of Ihe treck. <br /> 4 2 PAYMENT. Ballasted irackwork conslruction will be paid for at the Contract unit prices lor lhe <br /> computed quantities as delertnined by lhe measuremenl melhod specified above including <br /> construction engineering and preparation of submiftals, furnishing and installing running rail and <br /> cross ties wilh rail fasleners and plates,field reil welds,and superelevalion lags,prepa�ng subgrade <br /> and turni,hing and instetling of subballasl and ballast. <br /> END OF SECTION <br /> Permd Set 34 11 11 -5 <br /> September23. 2011 <br />