Laserfiche WebLink
BOEING EVERETT SECTION 34 11 13 <br /> NEW RAIL SPUR RAIL <br /> WORK ORDER 10-305 <br /> PART 1 -GENERAL <br /> 1.1 DESCRIPTION: This Seclion includes speciflcatians for the manufacturing,testing,fabricating,and <br /> shipping of slandard and high strength sleel rail as specified herein. <br /> 1.2 REFERENCE STANDARDS <br /> A The(ollowing Codes, Regulations, Reterence Standarda,and Specifications apply to the work <br /> �. TheAmerica�RailwayEngineeringandMaintenance-oi-WayAssociationManualtorRailway <br /> Engineering (AREMA Manual),Chapter 4. <br /> Z. American Society for Testing and Materials(ASTM) <br /> a. ASTM A578:Slendard Specification for Slraight-Beam Ultrasonic Exammation ol Plain <br /> end Clad S!eel Plalea tor Special Applicalion <br /> b. ASTM E10: Slandard Test Method tor Brinell Hardness for Metallic Materials <br /> 1.3 SUBMITTALS <br /> A. Submit the foilowing for approval in compliancP with Section 01 33 10, Submiqals, and wilh the <br /> addkional requirements as specified tor each: <br /> t. A detailed description oi the sleel metallurgy. <br /> Z. A deteiled description ollhe melhods end procedures to be used to remove hydrogen in the <br /> eteel. <br /> 3 A description of lhe ullrasonic testing melhai and equipmenl. <br /> 4. A descnption ot the method and venfication testing to echieve the required rail herdnesa. <br /> y. Quality Conlrol program descriplion as outlined in Article 1.04. <br /> 6. Submit the tollowing to lhe Boeing Construction Menager in accordance wilh the milestones <br /> shown on lhe approved Contract Schedule. <br /> a. Submil the melhod of handling, shipping,unloading,and stacking rail for review and <br /> approval al least four weeks before shipping of the reil. <br /> b Provide Ultresonic Technician qualification certiGcation for lhe individuals actually <br /> conduding the testing al leasl 30 days before lhe commencemenl 01 the in-plant <br /> inspeclion. <br /> c Provide rail sample's chemicel testing repoAs lor each rail heat. Each rail shall be <br /> stamped with a heal number,bloom number and'P'or'S'lo denote position within a <br /> bloom Provide lhe list oi rail representing the sample testing reports. <br /> d. Provide rail sample's lesling records,including mechanical properties tesls,hardness <br /> measurements,ullrasonic testing certifications that all reils are ultrasonically tested for <br /> internal delects Provide rail sample's testing records tor informal review dunng the in- <br /> plant inspection and fortnally submit to the Boeing Construclion Manager <br /> 341713- 1 <br /> Perm�t Set <br /> Seplember 23. 2071 <br />