Laserfiche WebLink
E30EING EVERETT SECTION 34 11 14 <br /> NEW RAIL SPUR BALLASTED SPECIAL TRACKWORK <br /> WORK ORDER 10-305 <br /> and reslope the subballasl outside the tce of slope of the ballast, as indicated on the Standard <br /> Drawings, as required <br /> 8 Measure(lange way dearances <br /> C Throw the switch, check ireedom oi movement, clearances, measure forr.e reqwred. <br /> END OF SECTION <br /> Permit Set 34 �� �4' S <br /> September 23. 2011 <br />