Laserfiche WebLink
Berkley Structures, Inc. E-3592 <br /> October 28, 1987 Page 2 <br /> practicinq un�er similar conditions in this area, for the exclusive <br /> use of Berkle} Structures, Inc. and their representatives. No other <br /> warranty, expresse�.i or implied, ie made. We recommend that this <br /> report, in its entirety, be included in the project contract <br /> documents Por the f.nformation of the contractor. <br /> The follow•ing secti.ons of thie report deccribe our study and contain <br /> qeotechnical cecom�endatione regarding foundation desiqn criteria, <br /> earthwork con:aidert�tions, and aite drainaqe. <br /> PROJECT DESCRIPTION <br /> The eite is located north of 75th Street Southwest and near 14th <br /> Avenue west, approximately as indicated on the Vicinity Map, Plate <br /> 1. At the time uur study was performed, the sita and propased <br /> building locations were approxfmately as shown on the Test Pit <br /> Location Plan, Plate 2. <br /> Based on our discuseions wit:� you, your architect and engineer, we <br /> understand you plan to construct a one hundred ninety-six thousand <br /> (196,000) square foot concrete tilt-up warehouse with fonr thousand <br /> (4000) square feet of attached office space. Column spacings will <br /> be on about a fifty (50) by fifty (50) foot qrid, with maximum loads <br /> of about one hundred (100) kips, including all dead and live loads. <br /> Wall loads will be �aboui two kips per lineal foot (klf) . A dock <br /> height concrete slab-on-gr+►de floar will be constructed along the <br /> north wall, and floor loadr. are estimated not to exceed two hundred <br /> fifty (250) pounda par square foot (psf) . <br /> On the basis of the proposed finish floor elevations and the <br /> apparent exieting eite grades, yov presently estimate cuts and fills <br /> in the propnsed building eres� on the order of between eiqht (8) and <br /> ten (]0) feet, and two (2) and twelve (12) feet, respectively. <br /> Parking lot area fills are also expected to be of similar magnitude. <br /> If any of the above design criteria change, we should be consulted I <br /> to review the recommendations contained in this report. In any <br /> case, we recommend Earth Consultanta, inc. (ECI) be retained to <br /> perform a qeneral review of the final design. � <br /> =S��E CONDITIONS <br /> u a e <br /> The property is located north of several existing Boeing warehouses <br /> anci the Beco office building which is north of 75th Street Southwest <br /> nerir 14th Avenue West, in Everett, Washington (see Plate 1) . The <br /> Earlh Consultants, Inc. <br />