My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2707 COLBY AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2707
>
BASE FILE
>
2707 COLBY AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 3:56:06 PM
Creation date
1/27/2017 5:01:30 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2707
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N. PUBLIC SERVICES AND UTILITIES (SEPA Public Services and Utilities <br />Policies) <br />1. The Applicant must collaborate with the City Department of Public <br />Works to develop a sewer main relocation plan that causes minimal <br />disruption of services. The Applicant must also work with other <br />utility operators to develop a utilities relocation plan that <br />causes minimal disruptions of their services and temporary closure <br />of public rights -of -way. The Applicant will be responsible for <br />notifying affected owners and tenants of any potential service <br />disruptions. <br />2. The Applicant must submit a utility relocation plan. The plan <br />must be reviewed and approved by the City prior to the issuance of <br />any permits which allow disruption of services. <br />3. The Applicant must pay special charges for connections to the City <br />of Everett's water and sewer systems in accordance with Ordinance <br />1171-85 (Section 7A). <br />4. The Applicant must construct an on -site water system that meets <br />the fire flow requirements of the Fire Marshal and the Public <br />Works Department. A pump and potential tank is required for the <br />north tower. <br />5. All existing sewers must be kept in service at all times. This <br />may require the use of a temporary sewer by -•pass pump or other <br />similar measures. Damage to existing sewers shall be repaired by <br />the contractor to a condition equal to or better than their <br />condition prior to the damage. <br />6. The City strongly encourages the recycling, reusing and/or <br />salvaging demolition and construction debris. Recycling should be <br />performed using one of the firms listed in the Department of <br />Ecology's "Construction Debris Recycling Resource Guide", unless <br />recycling capacity is not available. <br />7. Compactors should be used to store disposable wastes generated <br />from the project after construction. <br />B. The City strongly encourages the Building Owner to establish an <br />active recycling program for all tenants in the Colby Square <br />project. Space should be provided in the refuse area for <br />recyclables. <br />i <br />This Document incorporates all of the conditions and mitigating <br />( measures that the City of Everett has determined it will impose under <br />its SEPA substantive authority on the Colby Square proposal. All <br />permits and approvals necessary for the implementation of the Colby <br />Square proposal that are required by the City of Everett will be <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.