Laserfiche WebLink
� <br /> Me9 Hale-, <br /> From: Meg Haley <br /> Sent: Tuesday, November 27, 2007 8:04 AM <br /> To: 'kathi@beronaengineers.com' <br /> Subject: FW: 2814 Coiby building permit status <br /> Attachments: 3053_001.pdf; 3056_001.pdf; 3057_001.pdf; 0064_001 pdf <br /> Sorry Kathi. I misspelied your name on the tirst try� I�\;; � i{� -C.l. / <br /> -Meg <br /> From: Meg lialey <br /> Sent: Monday,IJovember 26, 2007 5:09 PM <br /> To: 'buaniY.email@venzon.ne['; 'Adam Ciark';Brert Kocs' <br /> Ce: 'mberona@beronaengineers.com';'kathr�erenaengineers.com' <br /> Subjed: 2814 Colby building pertnit status <br /> Thank you tor making the time to address our remaining questions regarding the use and mechanical design for the tenant <br /> improvement to lhe basement of 2819 Colby. Please advise if the following meeting summary shouid be corrected (lhe <br /> action items for the mechanical permit submittal will be sent by e-mail tomorrow). <br /> � A description of how the maximum occupant load wili be kept to 49 people by JASE LLC should be submitted to 7or.y <br /> Lee, Permit Service Manager, COE, for review. The drawings should not show more seating than the maximum <br /> occupant load will allow simultaneously in the spa pool area and the lounge area for a tolal of 49 people, unless exiting <br /> revisions are made to the plans as currently drawn. Clarifications rray be required to the 5rst floor entry area used as <br /> a control point for maximum occupancy. See attachment <br /> ✓• A future commercial kitchen with a Type I Hood would require the exiting to be revised to separate the two exits per <br /> code, with a separate corridor. <br /> `'• The drawings have to state clearly that the door separating the two tenants in the basement(JASE LLC 8 The Full <br /> Gospel Mission Church)will remain unlocked irom both directions since both tenants require two exits at all times <br /> from the basement, when the space is occupied. Required exit signage, emergency lighting and panic hardware <br /> shouid be r,hown on the plans. <br /> 1• The doors into the shower areas should have a 48 inch deep space between the str�ke and �he opposing wall; 54 <br /> inches if a closer is on the door, per ICC/ANSI Figure 404.2.3.1 (�. <br /> �• Specific materiais to controi the vapor from the pool and sauna areas should be show� on the architectural drawings <br /> �to include the ceiling treatment in addition to the wall and floor treatment. See attached e-maii. <br /> �� The ne�v exhaust fans on the roof should be shown to be a minimum ten feet away from the existing AHUs, see <br /> attachment tor reference. <br /> �• The drawings should clarify that the VA construction is utilizing the sprinkler substitution instead af rated floor-ceiling <br /> assemblies. The previous permits have been attached for reference. <br /> ---------------------------- <br /> I� � u L� i <br /> 3053_OOl.pdf(2 3056_OOl.pdf(267 3D57_001.pdf(1 OOfr7_OO1.pdf(21 I <br /> M6) KB) MB) KB) <br /> Meg-}{a.7.�ry <br /> Plans Examiner. City of[verett <br /> 3200 Ce�ar Street.f.vcu.;! l'�L�432G1 <br /> Ph:4i5-[�7.?�.:13. Fix:.i:; =`.;7-£:5�: <br /> www.everellwa.or4�deta�tll.asox?ID=J76 <br /> 1 <br />