My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3015 COLBY AVE 2016-01-01 MF Import
>
Address Records
>
COLBY AVE
>
3015
>
3015 COLBY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2017 9:30:47 AM
Creation date
1/27/2017 9:28:41 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3015
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> i <br /> �� <br /> �i <br /> I <br /> 4. 1972 plan; Halprin Policy 7, Cammerce and Finance, °[dentify, improve and <br /> i utilize structures of particular architectural and historic interest in the <br /> r downtown area, "recycle" fine old building rather than remove them." <br /> � Conclusion: The inability to renovate this building as proposed would be in <br /> , conflict with the Comprehensive Plan. <br /> REC.:)MMENDATION: APPROVAL <br /> Approve a variance for 4 parking spaces rather than the required 50 in the B-3 zone � � <br /> I with the following conditions: <br /> 1. Participation in voluntary employee carpool program is required. <br /> 2. Community transit and Everett transit schedules shal! be readily available and <br /> posted at a conspicuous location to encourage employees in the office complex <br /> to use public transportation. <br /> 3. The applicant shall convey a Power of Attorney for the cr_ation of a local <br /> improvement district for a future �ublic off-street parking structure. <br /> 4. The applicant shzll provide parking in the basement of the st��ucture to the <br /> degree physically feasible. <br /> � 5. A detailed drawirp shall be submitted to the Public Works Department showing <br /> parking layout, iandscaping, driveways, utilities, storm drainage, and all <br /> required improvements to the public right-of-way. Public Works Department � <br /> approval of these d�awings is required before any permits are issued. All <br /> improvements shall be completed before the Occupancy Permit is issued. <br /> i 6. Participation in the program to fund the north end sanitary sewer interceptor is <br /> required. � <br /> 7. During construction, city streets are to be kept clear of dirt and debris <br /> and all <br /> truck traific to and from the site within th.^. City of Everett shall be on arterial <br /> streets unless otherwise approved by the Public Works Department. <br /> APPROVED BY 7HB BOARD OF ADJUSTMENT I <br /> Date <br /> VOTE: FOR AGAINST ADSENT ABSTAIN <br /> ' Mr. Hoagland: <br /> A4r. Wilson: <br /> ,i Mr. Zook: -- I <br /> Mr. Eckstrom, Sa <br /> I� <br /> IChairman, Doard of Adjustment <br />' � �I <br /> i <br /> I I <br /> � <br />� � �; <br /> I I <br /> I i <br /> � <br /> iI I <br />. I I <br /> L <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.