My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/03/10 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/03/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2017 12:04:03 PM
Creation date
1/27/2017 12:03:13 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/10/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT-CH2M HILL EXHIBIT A-1-SCOPE OF WORK <br /> Exhibit A-1 9 <br /> Addendum to Scope of Work <br /> Effluent Transfer Project <br /> Phase 4 — Repair of Crosstown Pipe Lining <br /> Introduction <br /> Background: Phase 1 of the Effluent Transfer Project included the design definition for the <br /> pump station and new steel pipeline,Phase 2 included the final design services and bidding <br /> services,and Phase 3 included construction services support for the new steel pipeline and the <br /> effluent pump station. <br /> Phase 4,Repair of Crosstown Pipe Lining:The scope of work for Phase 4 includes site visits, <br /> inspection of the existing lining and pipe exterior,preparation of drawings and specifications <br /> for removal of the existing lining and placement of new cement mortar lining,design of a <br /> cathodic protection system,preparation of an opinion of probable cost,bidding services, <br /> preparation and attendance at a prebid meeting and preconstruction meeting,review of <br /> submittals, site visits during construction, assistance with responding to questions from the <br /> contractor, assistance with preparation of change orders,and assistance with preparation of <br /> the record drawings. Inspection services,if provided,will be included in an amended <br /> agreement. <br /> Schedule:- - <br /> The anticipated design schedule for Phase 4 is as follows: <br /> Begin work on design documents February 2 <br /> Project Review Team Kick-off Meeting February 9 <br /> Second Review Team Meeting February 17 <br /> Third Team Meeting&30%Submittal Review February 23 <br /> Fourth Meeting&60%Submittal Review March 1 <br /> Fifth Meeting&90%Submittal Review March 8 <br /> Sixth Meeting& 99%Submittal Review March 15 <br /> 100% Documents-Ready for Bid March 22 <br /> Open bids April 20 <br /> EXHIBIT A-1 FEBRUARY 25.DOC <br /> 1 `/7 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.