Laserfiche WebLink
Mr. Jef.frey McFall <br /> 3601 Colby Avenue Remodel #92/36499 <br /> 20 July 1592 <br /> Page 2 <br /> Issue 5 <br /> . Drawing A-6, Detail 5 - Guardrail <br /> . The detail as drawn �s correct. Three components comprise <br /> the 42" height total: <br /> , { 5) 1 -1 /4" dia. (I.D. ) rails are 1 . 66" O.D. - 8.33" <br /> . ( 5) 6" airspace openings - 30.00" <br /> . 4" raised concrete sill (6"- 2" asphalt) - 4.00" <br /> Issue 6 <br /> . Drawing A-6, Detail 6 - Retaining Wall @ Walk <br /> . Drawing has been revised to reflect reinforcing steei. <br /> spacing and free-drainage backfill full height <br /> Issue 7 <br /> . Drawing A-6, Detail 11 - Threshold @ �ntry <br /> . The detail utilizes a handicap accessible ramping <br /> threshold to overcome a necessary rise to lift the <br /> interior floor above an exterior plaza. <br /> . I have had to resort to an allowable 1 /2" step both above <br /> and below the ramp and ask if this is acceptable? <br /> Issue 8 <br /> . Drawing A-3, Door Schedule <br /> . Door No. 10 has been respecified to 36 inch width. <br /> . Although I have always specified 34 inch doors, a measure <br /> of one has shown it to be 1 /4" shy of the required wid':h. <br /> Issue 9 <br /> . Drawing A-7, Toilet Room Elevations <br /> . Elevations have been included to demonstrate appropriate <br /> placement and mounti.ng heights for handicap accessories <br /> . Floor and base finishes to comply with UBC 510 (b) have <br /> I been speci£ied by Drawing A-3 room finish schedule <br /> . 47a11 surfaces adjoining water closets (moisture resistant) <br /> are treated with epoxy paint in lieu of other measures. <br /> This finish has been approved not only by Seattle and King <br /> County, but also by Washington State Jept. of Health <br /> i (licensing hospital construction) . <br /> Issue 10 <br /> . Drawing A-3, Floor Plan <br />� . Toilet room ( #2) has been added in compliance with UBC 705 <br /> Issue 11 <br /> . Drawing A-3, Finish Schedule <br /> . Gypsum wallboard specification has been clarified to <br /> i' <br /> exclude water resistant sheetrock from ceiling application <br />� <br /> I <br />� <br />! <br /> t <br />