Laserfiche WebLink
Mr. Jeffrey McFall <br /> 3601 Colby Avenue Remodel #92J36999 <br /> 20 July 1992 <br /> Page 3 <br /> Issue 12 <br /> . Drawing A-6, Detail S - Section @ Stair <br /> , Section demonstrating head clearance, construction and <br /> code complying railings has been enclosed. <br /> Issue 13 <br /> . Struct-ural calculations will be submitted under separate <br /> cover <br /> Issue 19 <br /> , Drawiag A-2, Site Plan/Roof Plan <br /> , Ventilation calculations have been provided to conform <br /> with UBC 3205 (c) <br /> Issue 15 <br /> Ener4y Code Ca1.r,ulations - Lighting <br /> , The electrical lighting system will be contractor design/ <br /> build, with liyhting fixture bulb count (and several <br /> fixture) determined by this process. I can estimate the <br /> wattage budget of th.e plan as presented, but prefer to <br /> defer this issue until the submission of engineered plans <br /> for electrical permitting. <br /> Issue 16 <br /> . Prawing A-1 , First Floor Demolition Plan <br /> , This plan has been h.ighlighted to show existing floor <br /> configuration. Presently, it will serve only as shelled <br /> floor,/storage supporting the office floor above. A second <br /> phase office development of this first floor has not as <br /> yet been defined. <br /> Should the corrections as submitted be acceptable, the one <br /> remaining unresolved issue ( issue #13 - stamped structural <br /> calculations) will follow to conclude this plan review. <br /> If I may be of assistance to any questions you may have, please <br /> let me Y:now. <br /> Sin y, <br /> n vitt AIA <br /> Attachment: <br /> City of Everett correction list, dated 6/17/92 <br /> Drawing Sets AO-6 (two sets) , dated 7/20/92 <br />