Laserfiche WebLink
Page 1 Six-year Transportation Improvement Program <br /> Agency Everett From 2005 to 2010 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars __ Federally Funded <br /> A. Federal Aid No. Fund Source information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title - - RAN <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (rrNdd/yy) Code Phase Code Funds Funds Funds (2005) (2006) {2007) 6th Type (MM/YV) <br /> 1 2 3 4 5 6 7 8 9 - 10 11 12 13 14 15 16 17 18 19 20 21 - <br /> 11 1 3 phases in project 4 S 5.6 0 PE 1/1/1999 18,300 18,300 1,300 10,000 7,000 <br /> Interstate various RW 11/1/2005 20,000 20,000 10,000 10,000 <br /> 1-5 Median HOV Lanes and Auxiliary Lanes CN 5/1/2007 WSDOT 191,700 191.700 70,000 121,700 <br /> 1-5 <br /> SR 529(N.Broadway)to E.Marine View Drive <br /> Design and construct Median HOV and GP aux.lanes Totals230,000 230,000 1,300 20,000 87,000 121,700 <br /> 11 2 3 phases in project 3 P 0.1 0 PE 7/1/2003 Disc. 1,000 RTID 4,135 5,135 1,135 2,000 <br /> Interstate 5/630 P RW 1/1/2006 RTID 200 200 200 2,000 EA 11/1/2005 <br /> I-5/41st Street SE Interchange T CN 1/1/2007 RTID 38,800 38,800 8000 10,800 20,000 <br /> 1-5,41st Street <br /> I-5 at 41st Street to 1-5 at 41st Street <br /> Design and construct Interchange Improvements Totals 1,000 0 43,135 44,135 1,135 10,200 12,800 20,000 <br /> 11 3 3 phases in project 3 S 0.1 0 PE 1/1/2002 1,214 252 <br /> Interstate 5/620 (Sound Transit is lead on project) P RW 1/1/2005 427 205 EA 6/1/2005 <br /> I-5/112th St.Direct Access HOV-P&R/Flyer Stop T CN 7/1/2006 7,969 9,201 750 <br /> 1-5,112th Street SE 19,268 19,268 <br /> 1-5/112th Street SE to I-5/112th Street SE <br /> Design/Construct HOV Ramps,P&R Lot,Flyer Stop Totals 19,268 19,268 1,641 8,426 8,451 750 <br /> 11 4 3 phases in project 3 P 1.1 0 PE 1/1/2007 RTID 7,842 7,842 2,536 5,306 <br /> Interstate RW 6/1/2009 RTID 2,521 2,521 2,521 <br /> 1-5/Downtown Everett Interchange Improvements CN 9/1/2010 RTID 34,129 34,129 12,605 <br /> I-5 at Pacific,Hewitt,Everett Avenues <br /> Pacific Avenue to Everett Avenue <br /> Major reconfiguration of 1-5 offramps for Downtown Totals 44,492 44,492 2,536 20,432 <br /> 11 5 3 phases in project 1 P 0.1 0 PE 7/1/2009 RTID 4,560 4,560 4,560 <br /> Interstate RW 1/1/2010 RTID 3,990 3,990 3,990 <br /> 1-5/100th Street SE HOV Access/Undercrossing CN 1/1/2011 RTID 48,450 48,450 0 <br /> 1-5.100th Street SE <br /> SR 527 to South Everett Transit Center area <br /> Design and construct HOV access/undercrossing Totals _ 57,000 57,000 8,550 <br /> 11 6 3 phases in project 31 P PE 7/1/2009 RTID 1200 1,200 1200 <br /> Interstate 5/099 RW 1/1/2010 RTID <br /> I-5/Everett Mall Way Onramp CN 1/1/2012 RTID 10800 10800 <br /> NB Everett Mall Way to SB 1-5 <br /> NB Everett Mall Way to SB I-5 <br /> Design and construct Interstate Onramp Totals 12,000 12,000 1,200 <br /> 11 7 3 phases in project 1 P 0.3 0 PE 1/1/2008 WSDOT 1.000 1,000 2,000 2,000 <br /> Interstate RW 6/1/2009 WSDOT 1,000 2,000 3,000 3,000 <br /> 1-5/Smith Island Freeway Interchange CN 7/1/2010 WSDOT 8,000 ' 12,000 20,000 5,000 <br /> 1-5 at 12th St.NE or other location on Smith Island <br /> 12th St.NE,or other location north of 12th St.NE <br /> Design and construct freeway interchange Totals 10,000 15,000 25,000 1 0 10,000 <br />