Laserfiche WebLink
7 <br /> C. A memorandum summarizing the design review meeting minutes and the project manager's - _ <br /> response to design review suggestions. <br /> 5. A constructability review. <br /> 6. For the 90 percent cross check,the Client receives the benefit of a product that has been checked for <br /> consistency,accuracy,and coordination between disciplines. <br /> 7. A project debriefing. <br /> Page 15 <br /> S:1JMcC1e11\UP-51°=-WFP Chlorine Eldg\EWFP WaOC1 Scope of Work R3.doc <br /> 56 <br />