My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/03/23 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/03/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 2:53:29 PM
Creation date
2/7/2017 2:51:19 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/23/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> WHEREAS, the Planning Commission finds: <br /> 1. The purpose for the requested Comprehensive Plan land use map amendment and rezone <br /> is to make it possible for the PUD to formulate and act on long range load growth at this location <br /> in a predicable, orderly fashion over the next twenty years. <br /> 2. The need for the proposed rezone is to ensure the Utility will be able to meet energy <br /> demands over the long-term. <br /> 3. The PUD has made a convincing case for the need for such long term response to <br /> continued growth in the area served by the subject switching yard. <br /> 4. To achieve the request the City needs to; <br /> a. Amend the City's Comprehensive Plan map designation from Single <br /> Family (1.2) to Public Quasi Public Facilities (2.8). <br /> b. Add the Institutional Overlay zone to the property subject to approval of the <br /> Master Plan submitted with the application. <br /> c. Void Special Property Use permit (#16-84) upon the date of validity of the <br /> proposed rezone Ordinance. <br /> 5. This Resolution is intended to convey Planning Commission support for the PUD Master <br /> Plan phases outlined here as: <br /> Phase I: Already completed under the existing SPU (16-84) <br /> Phase II: Approximately in the next 5 to 10 years. <br /> Add an additional switch assembly similar to the one now existing on the site. Phase II would be <br /> placed north of and in alignment with the Phase I assembly. <br /> Phase III Approximately 10 to 20 years from now. <br /> Add an additional switching assembly to the east and slightly down hill from the Phase I <br /> and Phase II assemblies. The 3rd phase will provide for delivery of power at an increased <br /> voltage of 230 kV. This power will be transformed to 115 kV and distributed through the 115 <br /> kV switching assembly. <br /> 138 <br /> - 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.