My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/04/27 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/04/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 4:13:08 PM
Creation date
2/7/2017 4:12:05 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/27/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 Task 2 — Data Collection <br /> 2.1 Objective <br /> Work with City staff to obtain information needed to complete the CWP. <br /> 2.2 HDR Services <br /> 1. Prepare a data needs checklist with the City. <br /> 2. Meet with City Engineering and Operations staff to tour water system facilities and review <br /> system condition and operational issues and concerns <br /> 3. Prepare a working facilities tour memorandum outlining condition and operational issues <br /> 4. Prepare a list of the CWP reference materials provided by the City <br /> 2.3 City Responsibilities <br /> 1. Provide copies of requested water system data in a timely manner. <br /> 2. Host a water system facilities tour for the project team with City engineering and O&M <br /> staff. <br /> 2.4 Assumptions <br /> 1. The data collection meeting and facilities tour site visit will be over a two day period. <br /> 2. The City will provide the requested water system data within a four week period. <br /> 2.5 Deliverables <br /> 1. Reference materials list <br /> 2. Facilities tour memorandum <br /> 3.0 Task 3 — Water System Description (CWP Chapter 1) <br /> 3.1 Objective <br /> Describe the characteristics of the City of Everett water system. <br /> 3.2 HDR Services <br /> 1. Work with appropriate City staff to review and update each section of the Water System <br /> Description from the 2000 CWP. The following water system components will be <br /> described: <br /> • Ownership and Management <br /> • Overview— Pressure Zones <br /> • Source of Supply <br /> • Water Filtration Plant <br /> • Transmission System <br /> • Pump Stations <br /> Everett Comprehensive Water Plan q 7 April 15,2005 <br /> Exhibit A—Scope of Services Page 2 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.