Laserfiche WebLink
2. Identify recommended changes to current operations and maintenance program that will <br /> require funding through the CIP. <br /> 3. Evaluate feasibility and implications of contracting out routine uni-directional flushing <br /> activities. <br /> 11.3 City Responsibilities <br /> 1. Review 2000 CWP and provide mark-ups. <br /> 2. Meet with consultant to review updates. <br /> 3. Review and comment on draft and final Chapters. <br /> 11.4 Assumptions <br /> 1. As part of the 2000 CWP, a separate, detailed O&M plan was developed by the City. It is <br /> assumed that the consultant will not be assisting with updates to that document. <br /> 11.5 Deliverables <br /> 1. Draft and final Chapters of the CWP <br /> 2. List of O&M improvements to be included in the CIP. <br /> 3. Technical memorandum on feasibility of contracting out the City's flushing program, with <br /> recommendations. <br /> 4. Detailed system operations and maintenance information judged to be important to system <br /> vulnerability will only be included in the working draft and will not be included in the final <br /> operations and maintenance chapter. <br /> 12.0 Task 12 — Design and Construction Standards and <br /> Specifications Update (CWP Chapter 9) <br /> 12.1 Objective <br /> Document and summarize the City's water system Design and Construction Standards that are <br /> used for planning, design, and operation of the water system. <br /> 12.2 HDR Services <br /> 1. Project Review Procedures - Review and document in-house review procedures for new <br /> water projects <br /> 2. Identify specific design and construction standards requirements for outside parties. <br /> 3. Review and comment on existing City Design Standards: <br /> • Use existing Design Standards as a starting point to suggest revisions and/or updated <br /> standards. <br /> • Research other utilities design standards to identify if any standards are missing from <br /> the Everett list. <br /> 4. Construction Standards and Specifications <br /> • Use existing Construction Standards and Specifications as a starting point to suggest <br /> reviign and/or updated Construction Standards and Specifications. <br /> 1 <br /> Everett Comprehensive Water Plan April 15, 2005 <br /> Exhibit A—Scope of Services Page 17 of 21 <br />