12 <br /> 29. Additional underground ductile iron pipe fittings. $3,344.96 <br /> 30. Demo concrete curb at Operations Bldg overhead door. $1,496.44 <br /> 31. Install air release piping& vault at the high point in the Plant Water Pump Station <br /> underground suction line. $831.49 <br /> Total cost of $120,232.64 <br /> JUSTIFICATION: <br /> The reasons for the above additional work fall under three separate categories as <br /> listed below. <br /> 1. Additional Scope. The following work change directives fall into this category. <br /> Work change directive numbers 2, 3, 7, 8, 12, 13, 16, 18, 20,26, 27a, 29,30 & <br /> 31. <br /> 2. Unknown or changed conditions. Work change directive numbers 4, 5, 6,& 9 fall <br /> into this category. <br /> 3. Design omissions. Work change directives numbers 1, 15, 17 & 23 fall into this <br /> category. <br /> Further explanation or justification on the three larger dollar cost work change directives <br /> 9. 16 & 17 are described below. <br /> Work Change Directive # 9. Style of soil anchors required for the Alum/Polymer Storage <br /> Building were revised from the specified helical tension anchors to earth grouted columns <br /> because the soil was not as predicted in the soils report used to design the anchors. <br /> Work Change Directive #16. 420 LF of 8-inch ductile iron pipe, fittings and valves were <br /> added at the City's request to allow installation of underground piping needed for the <br /> next phase of construction. Scheduling the work in this Contract prevented seasonal <br /> impacts that would have been created if done in the next contract. <br /> Work Change Directive # 17. The plans were lacking in adequate detail to provide shop <br /> drawings for the structural steel building. The fabricator worked with the Contract <br /> Design Engineer to add required connection details and structural members. The <br /> additional costs include design time,added materials, added fabrication and erection plus <br /> time delays in this critical path construction, <br /> Please note that the numbers on the work change directives listed above <br /> are not sequential and that roughly 10 work change directives on various <br /> issues are currently under negotiation between the City and the <br /> Contractor. When negotiations on these issues are finished they will be <br /> summarized into future change order#2. <br /> 125 <br /> Exhibit A <br />