My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/04/27 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/04/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 4:13:08 PM
Creation date
2/7/2017 4:12:05 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/27/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br /> Contract Time <br /> Original contract time of this project was for 210 calendar days. Seventy Three,(73), <br /> additional calendar days are being added to the contract time due to the fact that the <br /> original contract drawings were not of sufficient information and detail to provide <br /> structural steel shop drawings in a timely fashion. The net result was late delivery of <br /> structural steel to the jobsite. <br /> The above additional cost of$120,232.64 constitutes all additional cost of any kind <br /> resulting from adding 73 calendars days to the contract time, from the above <br /> described work changes directives. <br /> 12 6 <br /> Exhibit A <br />
The URL can be used to link to this page
Your browser does not support the video tag.