Laserfiche WebLink
; <br /> M �� � �, <br /> "'I <br /> � � y � <br /> p O <br /> C f+ <br /> N <br /> y M .,,i <br /> K n W.. <br /> a � o After overexcavation/strip�ing has been performed to the satisfaction of the geotechnical <br /> ro y � engineedengincering geolog�st, the upper 12 mches of exposed ground should be recompacted <br /> � x to 90 percent of the Modified Prcetor Maximum Density usmg ASTM:D 1557 as the standard. <br /> ro � If the subgrade contains too much moisture, adequate recompaction may be difficult or <br /> � � inpossible to obtain and shoul� probably not be attempted. In lieu o(recompaction, the area <br /> � ;� g to receive fill should be blanketed wilh washed rock or quarcy spalls to act as a capillary break <br /> x y � ,_ between the new fill and the wet subgrade. <br /> dy y After recompaction of the expnsed ground is tested and app.�oved, or a free-draining rock <br /> $ o y , course is 1aid, strucWral fill may be placcd ', attain desired grades. Swctura] fill is defined as <br /> � � r non-organic soil, acc�ptable to the geotect.nical engineer, placed in maximum 8 inch loose <br /> h y _ lifts, with each fift being compacled to 95 percent of the Modified Proctor Maximum Deasity <br /> � y usin g ASTM:D 1557 as the standard. The top of the compacted fill should extend horizontally <br />! outward a minimum distance of 3 teet beyond the location of the perimeter footings or <br /> pavement edge beCore sloping down at a m<ximum angle of 2Si:1V (Horizontal:Vertical). <br /> The contractor should note lhat any proposed fill soils must be evaluated by Associated Farth <br /> Sciences, Inc. prior to their use m fills. This would require that we have a sample of the <br /> __ material 48 hours in advance to perform a Proctor test and determine its field com�action <br /> standard. Soils in which the amount of fine-grained matr.rial (smaller than No. 200 sieve) is <br /> - greater than approximately 5 percent (measured on the minus No. 4 sieve size) should be <br /> considered mois;ure-sensiuve. Use of moisturc-sensitive soi� in structural lills should be <br /> limited to favorable dry weather conditions. Some of the onsite soils contained significant <br /> amounts of silt and are considered moisture-sensitive. In addition, constructicn eyuipment <br /> Uaversing the site when the soils azc wel can cause considerable di�wrbance. If fill is placed <br /> ���� -- during wet wea.ther, or if proper compaction cannot be obtained, a select material consisting of <br /> �r clean, free-draining sand or gravel should be used in lieu of onsite material. Some free- <br /> draining soil may be obtainable frem potential cut areas within the northeastern portion of the <br /> 1 ' _ property. Frce-draining fill consists of non-organic soil with the amount of fine-grained <br /> ��. matenal hmited to 5 percent by weight when measured on the minus No. 4 sieve fraclion. <br /> �� _• <br /> A representative from our firm should inspect the stripned subgrade and be present during <br /> placement of structural fill to observe Ihe work and per�orm a representative number of in- <br /> �� place density tests. In this way, the adequacy of the earthwork may be evaluated as filling <br /> I �� ' progresses and any problem area; may be cortecte:d at that Iime. It is important to understand <br /> , that taking random compaction tests on a part-time basis will not assure uniformity or <br /> acceptable performance of a fill. As soch, we are availabie to aid the owner in developing a <br /> � suitable monitoring and testing program. <br /> �� <br /> S.0 FOUNDATION� <br /> + ����� Spread footings may be used for building support when founded on Ihe existing dense fll soil <br /> " � or structural fill placed as previously discussed. If footings arc to be (ounded in the existing <br /> i fill soils, the upper 1 foot of the fooung subgredcs should be recompacted to a minimum of 95 <br /> percent of max�mum dry density, using a hoepac compactor or a v�bratory roller, if wider <br /> �I �� footing trenches are excavated. This compaction is reqwred to densi(y any loose or sofl areas <br /> l and to help identify any unsuitable areas within the exisung fill. Compaction must therefore be <br /> performed under the observation of Associated Earth Sciences, Inc.'s field engineer so that any <br /> problem areas ca.n be cortected prior to footing placcment. We recommend that an allowable <br /> bcaring pressure of 2,C00 pow ds per square foot (psQ bc utiliud for design purposes, <br /> 6 <br />