My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5929 EVERGREEN WAY BASE FILE 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
5929
>
BASE FILE
>
5929 EVERGREEN WAY BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 10:01:56 PM
Creation date
2/9/2017 10:00:40 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5929
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ � <br /> Proposed <br /> MlTIGATED <br /> DETERMINATION OF NON-SIGNIFICANCE <br /> SEPA #67-96 <br /> Evergreen Center Office Building <br /> DESGRIPTION 7F PROPOSAL: Demolish existing office building.and construct a two-story, <br /> 12,000 square foot office buiiding with 72 parking stalls. A variance from the 28' height limit <br /> and Type I landscape standard is proposed. <br /> PROPONENT: Richard and Rob Ciark <br /> 5929 Evergreen Way <br /> Everett, WA 98203 <br /> PROPONENT'S <br /> REPRESENTATIVE: Robert Champion, Architect <br /> 3802 Colby Avenue <br /> Everet+ WA 98201 <br /> LOCATION: 5929 Evergreen Way <br /> ZONING: B-2, Community Business <br /> GENERAL PLAN: 4.4, Mixed Use Commercial/Multiple Family <br /> Lead Agency: City of Everett Planning Department <br /> Contact Person: David Tyier Phone: 259-8731 <br /> Mitigation Measures: <br /> The environmental impacts of this proposal are documented in the Environmental Checklist and <br /> other informa'ion on file with the City. The listed requirements are placed in response to our <br /> review of this information: <br /> AGENCIES WITH JURISDICTION: None identified <br /> MITIGATION OF �?DVERSE IMPACTS BY SEPA <br /> 1. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> (SEPA Earth, Land and Shoreline Use Policies.) <br /> 2. Prior to issuance of any permits, the Applicant must pay a mitigation fee of$11,653.00 <br /> per the Interim Traffic Mitigation Ordinance No. 1670-89, as amended. (SEPA <br /> Transportation Poiicies) <br /> 3. A tra�c mitigation fee of per the City's Interim Traffic Mitigation Ordinance must be paid <br /> prior to building permit issuance. <br /> 4. Evergreen Way is designated as a "Gateway" corridor in the City's General Plan. The <br /> General Plan states, "Because Everett wants to develop and promote an attractive <br /> � 2930 Wetmore, Suite 100, �verett, WA 98201 Si (206)259-8731, Fax (206) 259-8742 <br />
The URL can be used to link to this page
Your browser does not support the video tag.