Laserfiche WebLink
-� <br />�h� <br />ay <br />q�H <br />9 Hx Cn <br />H ZH <br />�H� <br />��-y H'�J <br />V1 H <br />C+7 O h] <br />H G7 <br />HL'���1 O <br />� � c� <br />9H� <br />� <br />� HH <br />g� <br />ri <br />C] C fA <br />��� <br />z H cn <br />H O Cn <br />(� r <br />'tl w <br />� � <br />I 0 j <br />D -,g'sj <br />?3. <br />24. <br />Hydrant locations are fine for the grocery and the restaurant <br />buildings. An add:ltional hydrant may be required when the office <br />build3ng is constructed. �SEPA Public Servicea and Utilities Policies) <br />Provlde a sprinkler system complying with U➢C Standard 38-1 and/or NFPA <br />Standard 13. (SEPA Public Services and Utilities Policies) <br />Plans for any such system muat be suhmitted to the Building Department <br />and/or the Everett Fire Departme¢t for examination and approval. Such <br />plans must include plans for the underground mains that will supply the <br />sprinkler system. <br />Aboveground sprinkler piping must be hydrostatically tested as <br />established in NFPA Standard 13. Underground piping mus[ be <br />hydrostatically tested and fused as established in NFPA Standard 24 for <br />private fire mains. All such tests must be witnessed by a Fire <br />Department Inspector. Call 259-8710 to make an appointmeat for <br />inspection. <br />Contractors materials and test certificates must be submitted to the <br />Everett Pire Department prior to iesuance of any certification of <br />occupancy. <br />Call 259-8726 for more lnformation. <br />25. Fire lanes muat be provided as required in Everett Atunicipal Code <br />46.44. Fire lanes must be identified by red curbs with white stencil <br />stati¢g 'No Parking - Fire Lane'. Vertical signa stating 'No Parking - <br />Fire Lane - Tow Away Zone' to be located as approved by the Fire <br />Marshal. �SEPA Public Services and Utilitles Policies) <br />26. 9 portable fire extinguisher with a minimum UL Rating of 2A must be <br />provided within 75' travel distance of all portions of each building <br />during construction and prior to occupancy. iSEPA Public Services and <br />Utilities Policies) <br />27. Pedestrian/Transit Requirements: <br />a. Any barriers preventing pedestrians from moeing from tlie street <br />to and among buildings should be eliminated. iSEPA <br />Transportation/Circulation Policies) <br />b. Sidewalks and/or pedestrian paths should be constructed to <br />provide a direct route from the office building to �e:green Way; <br />from the restaurant to Evergreen Way and; from the supermarket to <br />Evergreen Way along the drainage filtration area. �SEPA <br />Transportation/Circulation Policies) <br />�, We also recommend awning or arcades alon� the walkcrays in front <br />of all buildings and pedestrian connections to adjacent uses <br />wherever possible. (SEPA Transportation/Circulation Policies) <br />-5- <br />